IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,046

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0110 # 09 Y:2005 09 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,156 $81,881 Implemented
IC0110 # 08 Y:2005 08 2005 OPTIMIZE PLANT POWER FACTOR $13,904 $70,000 Implemented
IC0110 # 07 Y:2005 07 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $7,443 $15,000 Not Implemented
IC0110 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,956 $0 Implemented
IC0110 # 05 Y:2005 05 2005 IMPROVE COMBUSTION CONTROL CAPABILITY $13,789 $3,500 Implemented
UM0293 # 06 Y:2005 06 2005 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $227 $200 Implemented
UM0293 # 05 Y:2005 05 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,239 $0 Not Implemented
UM0293 # 04 Y:2005 04 2005 OPTIMIZE PLANT POWER FACTOR $3,999 $2,728 Not Implemented
UM0293 # 03 Y:2005 03 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,085 $50 Implemented
UM0293 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,506 $175 Implemented
UM0293 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,861 $18,165 Implemented
GT0811 # 01 Y:2005 01 2005 IMPROVE LUBRICATION PRACTICES $3,405 $0 Implemented
GT0811 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,824 $20,700 Implemented
GT0811 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,607 $6,694 Not Implemented
GT0811 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,135 $3,000 Implemented
GT0811 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,312 $750 Implemented
GT0811 # 06 Y:2005 06 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,877 $1,300 Implemented
GT0811 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,119 $5,334 Not Implemented
GT0811 # 08 Y:2005 08 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $162,720 $25,000 Not Implemented
SD0374 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,046 $52,243 Implemented
SD0374 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,927 $7,500 Implemented
SD0374 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,769 $140 Implemented
SD0374 # 04 Y:2005 04 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,982 $220 Implemented
SD0374 # 05 Y:2005 05 2005 COVER OPEN TANKS $2,000 $4,500 Not Implemented
SD0374 # 06 Y:2005 06 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $688 $350 Implemented