IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6

matching recommendations
Reset
ARC 2.725 Evaporation
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0230 # 06 Y:1991 06 1991 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $2,240 $10,970 Implemented
RU0126 # 04 Y:1991 04 1991 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $2,736 $3,372 Implemented
AS0031 # 03 Y:1991 03 1991 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $7,962 $20,000 Not Implemented
AS0023 # 12 Y:1991 12 1991 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $4,237 $6,400 Not Implemented
AS0022 # 02 Y:1991 02 1991 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $12,409 $30,000 Implemented
AS0021 # 04 Y:1991 04 1991 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $12,913 $35,000 Implemented