IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,685

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0031 # 04 Y:1995 04 1995 INSTALL OCCUPANCY SENSORS $529 $150 Not Implemented
BD0031 # 05 Y:1995 05 1995 SHUT OFF PILOTS IN STANDBY EQUIPMENT $87 $20 Implemented
BD0031 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $1,936 $581 Not Implemented
BD0031 # 07 Y:1995 07 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,529 $10,500 Not Implemented
BD0031 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,569 $600 Implemented
BD0033 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,652 $500 n/a
BD0033 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $274 $400 n/a
BD0033 # 03 Y:1995 03 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,800 $180 n/a
BD0033 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $463 $391 n/a
BD0033 # 05 Y:1995 05 1995 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $990 $1,550 n/a
BD0033 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,667 $12,480 n/a
BD0033 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,476 $350 n/a
BD0032 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,546 $600 Not Implemented
BD0032 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $3,653 $3,000 Not Implemented
BD0032 # 03 Y:1995 03 1995 CONVERT TO ELECTROSTATIC POWDER COATING $40,960 $1,900 Not Implemented
BD0032 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,743 $11,340 Not Implemented
BD0032 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $392 $20 Not Implemented
BD0030 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,470 $19,120 Not Implemented
BD0030 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $3,687 $1,000 Not Implemented
BD0030 # 03 Y:1995 03 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,048 $460 Not Implemented
BD0030 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $132 $280 Not Implemented
BD0030 # 05 Y:1995 05 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $483 $560 Not Implemented
BD0030 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,698 $2,199 Not Implemented
BD0030 # 07 Y:1995 07 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,508 $1,020 Not Implemented
BD0028 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $295 $350 Not Implemented