IAC logo
IAC Assessment: BD0030
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0030
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1995
Principal Product Dairy Products
NAICS n/a
SIC 2026 - Fluid Milk
Sales $10,000,000-$50,000,000
# of Employees 102
Plant Area (Sq.Ft.) 33,700
Annual Production 145,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $241,099 4,658,851 kWh $0.05
Natural Gas $36,886 16,329 MMBtu $2.26
TOTAL ENERGY COSTS $277,985
RECOMMENDED SAVINGS* $22,026 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$11,470
Cost:
$19,120
$11,470 221,571 - - $11,470
221,571
kWh
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,687
Cost:
$1,000
$3,687 71,219 - - $3,687
71,219
kWh
-
-
MMBtu
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,048
Cost:
$460
$1,048 20,223 - - $1,048
20,223
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$132
Cost:
$280
$132 2,638 - - $132
2,638
kWh
-
-
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$483
Cost:
$560
- - $483 213 -
-
kWh
$483
213
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,698
Cost:
$2,199
$1,698 32,825 - - $1,698
32,825
kWh
-
-
MMBtu
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,508
Cost:
$1,020
$3,508 67,702 - - $3,508
67,702
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$22,026
Cost:
$24,639
$21,543 416,178 $483 213 $21,543
416,178
kWh
$483
213
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas