IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,391

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0255 # 01 Y:2004 01 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,352 $17,885 Not Implemented
BD0255 # 02 Y:2004 02 2004 INSTALL REPLACEMENT DOORS $13,961 $14,000 Not Implemented
BD0255 # 03 Y:2004 03 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $11,914 $11,000 Not Implemented
BD0255 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,576 $13,050 Not Implemented
BD0255 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,780 $2,000 Not Implemented
BD0255 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $2,761 $2,550 Not Implemented
BD0255 # 07 Y:2004 07 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,586 $2,000 Not Implemented
BD0255 # 08 Y:2004 08 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,238 $750 Not Implemented
BD0255 # 09 Y:2004 09 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,069 $1,500 Not Implemented
BD0255 # 10 Y:2004 10 2004 INSTALL TURBULATORS $899 $1,200 Not Implemented
BD0255 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $739 $995 Not Implemented
BD0255 # 12 Y:2004 12 2004 INSTALL OCCUPANCY SENSORS $570 $150 Not Implemented
BD0255 # 13 Y:2004 13 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,428 $2,000 Not Implemented
BD0255 # 14 Y:2004 14 2004 AUTOMATE PAYROLL SYSTEM $6,240 $3,000 Not Implemented
BD0255 # 15 Y:2004 15 2004 PAY BILLS ON TIME TO AVOID LATE FEES $2,190 $0 Not Implemented
BD0254 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,778 $6,000 Implemented
BD0254 # 02 Y:2004 02 2004 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $6,110 $38,400 Not Implemented
BD0254 # 03 Y:2004 03 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,567 $521 Implemented
BD0254 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,675 $700 Implemented
BD0254 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,728 $2,885 Not Implemented
BD0254 # 06 Y:2004 06 2004 USE SYNTHETIC LUBRICANT $2,104 $700 Implemented
BD0254 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,257 $1,000 Implemented
BD0254 # 08 Y:2004 08 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,134 $3,500 Implemented
BD0254 # 09 Y:2004 09 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $826 $1,514 Not Implemented
BD0254 # 10 Y:2004 10 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $766 $0 Implemented