Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
208
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0493 # 08 Y:2016 | 08 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $188 | $500 | n/a |
BD0493 # 05 Y:2016 | 05 | 2016 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,280 | $50 | n/a |
BD0493 # 01 Y:2016 | 01 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $17,520 | $1,900 | n/a |
BD0493 # 02 Y:2016 | 02 | 2016 | REPLACE BOILER | $7,259 | $14,000 | n/a |
BD0493 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $932 | $20 | n/a |
BD0493 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,605 | $600 | n/a |
BD0493 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $925 | $1,050 | n/a |
BD0493 # 03 Y:2016 | 03 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,620 | $6,000 | n/a |
BD0492 # 01 Y:2016 | 01 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $17,166 | $21,060 | n/a |
BD0492 # 09 Y:2016 | 09 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $485 | $1,200 | n/a |
BD0492 # 08 Y:2016 | 08 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $529 | $75 | n/a |
BD0492 # 02 Y:2016 | 02 | 2016 | INSULATE BARE EQUIPMENT | $10,912 | $4,050 | n/a |
BD0492 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,039 | $20 | n/a |
BD0492 # 10 Y:2016 | 10 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $285 | $200 | n/a |
BD0492 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $476 | $600 | n/a |
BD0492 # 04 Y:2016 | 04 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,305 | $500 | n/a |
BD0492 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,299 | $6,032 | n/a |
BD0492 # 11 Y:2016 | 11 | 2016 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $225 | $200 | n/a |
BD0492 # 03 Y:2016 | 03 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,352 | $2,600 | n/a |
BD0491 # 10 Y:2016 | 10 | 2016 | INSULATE BARE EQUIPMENT | $601 | $1,800 | Not Implemented |
BD0491 # 07 Y:2016 | 07 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,131 | $2,800 | Implemented |
BD0491 # 01 Y:2016 | 01 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,795 | $6,550 | Implemented |
BD0491 # 11 Y:2016 | 11 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $209 | $190 | Implemented |
BD0491 # 06 Y:2016 | 06 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,427 | $1,000 | Implemented |
BD0491 # 04 Y:2016 | 04 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,994 | $20 | Implemented |