Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
997
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0013 # 06 Y:2013 | 06 | 2013 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,270 | $360 | Not Implemented |
BS0012 # 01 Y:2013 | 01 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,483 | $900 | Implemented |
BS0012 # 02 Y:2013 | 02 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,601 | $8,272 | Implemented |
BS0012 # 03 Y:2013 | 03 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,998 | $0 | Implemented |
BS0012 # 04 Y:2013 | 04 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,065 | $8,525 | Not Implemented |
BS0012 # 05 Y:2013 | 05 | 2013 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $11,249 | $3,500 | Not Implemented |
BS0012 # 06 Y:2013 | 06 | 2013 | ELIMINATE/REDUCE AN OPERATION | $1,098 | $422 | Not Implemented |
BS0012 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,594 | $26,100 | Implemented |
BS0012 # 08 Y:2013 | 08 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,596 | $6,725 | Not Implemented |
BS0012 # 09 Y:2013 | 09 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,916 | $14,075 | Not Implemented |
BS0012 # 10 Y:2013 | 10 | 2013 | INSULATE BARE EQUIPMENT | $340 | $2,905 | Not Implemented |
BS0011 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,102 | $973 | Implemented |
BS0011 # 02 Y:2012 | 02 | 2012 | REDUCE VENTILATION AIR | $4,008 | $6,725 | Implemented |
BS0011 # 03 Y:2012 | 03 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $15,728 | $29,500 | Not Implemented |
BS0011 # 04 Y:2012 | 04 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,878 | $6,670 | Not Implemented |
BS0011 # 05 Y:2012 | 05 | 2012 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $8,243 | $900 | Not Implemented |
BS0011 # 06 Y:2012 | 06 | 2012 | INSTALL OCCUPANCY SENSORS | $250 | $600 | Implemented |
BS0010 # 01 Y:2012 | 01 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $289 | $630 | Not Implemented |
BS0010 # 02 Y:2012 | 02 | 2012 | INSULATE BARE EQUIPMENT | $222 | $512 | Implemented |
BS0010 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,826 | $750 | Not Implemented |
BS0010 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $645 | $251 | Implemented |
BS0010 # 05 Y:2012 | 05 | 2012 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $70 | $60 | Not Implemented |
BS0008 # 01 Y:2012 | 01 | 2012 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $9,360 | $350 | Not Implemented |
BS0008 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,298 | $14,400 | Not Implemented |
BS0008 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,079 | $117 | Not Implemented |