Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
58
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0018 # 01 Y:2023 | 01 | 2023 | INSULATE FEEDWATER TANK | $2,497 | $500 | n/a |
CC0018 # 06 Y:2023 | 06 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $95,279 | $350,000 | n/a |
CC0018 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,300 | $0 | n/a |
CC0018 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,158 | $10,000 | n/a |
CC0018 # 05 Y:2023 | 05 | 2023 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $16,265 | $70,000 | n/a |
CC0018 # 02 Y:2023 | 02 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $31,506 | $10,000 | n/a |
CC0016 # 03 Y:2023 | 03 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $11 | $0 | n/a |
CC0016 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,351 | $0 | n/a |
CC0016 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,427 | $1,000 | n/a |
CC0016 # 01 Y:2023 | 01 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $19,844 | $20,000 | n/a |
CC0015 # 04 Y:2023 | 04 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $199 | $360 | n/a |
CC0015 # 03 Y:2023 | 03 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,983 | $2,000 | n/a |
CC0015 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,040 | $7,085 | n/a |
CC0015 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $278 | $400 | n/a |
CC0014 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,512 | $1,000 | n/a |
CC0014 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,932 | $53,322 | n/a |
CC0014 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,695 | $11,000 | n/a |
CC0014 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $41,841 | $26,106 | n/a |
CC0014 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,527 | $2,000 | n/a |
CC0014 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,768 | $1,000 | n/a |
CC0014 # 02 Y:2023 | 02 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $7,788 | $800 | n/a |
CC0013 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,363 | $0 | n/a |
CC0013 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,074 | $0 | n/a |
CC0013 # 03 Y:2023 | 03 | 2023 | HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE | $4,697 | $8,400 | n/a |
CC0013 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $33,597 | $180,600 | n/a |