Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
243
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0032 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $59,248 | $0 | n/a |
CC0032 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $47,565 | $84,000 | n/a |
CC0032 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $13,869 | $14,141 | n/a |
CC0032 # 03 Y:2023 | 03 | 2023 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $314,706 | $1,607,040 | n/a |
CC0032 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,274 | $7,400 | n/a |
CC0031 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,100 | $3,000 | n/a |
CC0031 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,751 | $0 | n/a |
CC0031 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $147 | $340 | n/a |
CC0031 # 03 Y:2023 | 03 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $34,115 | $205,795 | n/a |
CC0031 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $14,525 | $19,500 | n/a |
CC0031 # 01 Y:2023 | 01 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,780 | $15,000 | n/a |
CC0030 # 02 Y:2023 | 02 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $13,211 | $9,178 | n/a |
CC0030 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $905 | $1,004 | n/a |
CC0030 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $67,679 | $28,946 | n/a |
CC0030 # 04 Y:2023 | 04 | 2023 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $5,083 | $1,269 | n/a |
CC0030 # 05 Y:2023 | 05 | 2023 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $64,875 | $571,150 | n/a |
CC0030 # 06 Y:2023 | 06 | 2023 | REPLACE BOILER | $7,589 | $100,666 | n/a |
CC0030 # 07 Y:2023 | 07 | 2023 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $22,872 | $0 | n/a |
CC0030 # 08 Y:2023 | 08 | 2023 | INSULATE BARE EQUIPMENT | $219 | $868 | n/a |
CC0028 # 05 Y:2023 | 05 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,311 | $0 | n/a |
CC0028 # 04 Y:2023 | 04 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $8,063 | $20,000 | n/a |
CC0028 # 01 Y:2023 | 01 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,157 | $3,110 | n/a |
CC0028 # 09 Y:2023 | 09 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $12,193 | $75,000 | n/a |
CC0028 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $3,687 | $5,300 | n/a |
CC0028 # 02 Y:2023 | 02 | 2023 | INSULATE FEEDWATER TANK | $1,517 | $700 | n/a |