Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

253

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL2113 # 03 Y:2021 03 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,986 $400 n/a
CL2113 # 02 Y:2021 02 2021 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $35,000 $12,000 n/a
CL2113 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,351 $62,500 n/a
CL2114 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $66,420 $37,500 n/a
CL2114 # 04 Y:2021 04 2021 INSTALL TIMERS AND/OR THERMOSTATS $10,678 $4,250 n/a
CL2114 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,331 $0 n/a
CL2114 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $1,148 $1,615 n/a
CL2114 # 01 Y:2021 01 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,537 $0 n/a
CL2112 # 05 Y:2021 05 2021 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $192 $0 n/a
CL2112 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,967 $17,500 n/a
CL2112 # 03 Y:2021 03 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $293 $260 n/a
CL2112 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,367 $0 n/a
CL2112 # 01 Y:2021 01 2021 INSTALL TIMERS AND/OR THERMOSTATS $2,080 $5,100 n/a
CL2111 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $590 $2,100 n/a
CL2111 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,665 $4,684 n/a
CL2111 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $1,957 $3,255 n/a
CL2111 # 04 Y:2021 04 2021 INSTALL TIMERS AND/OR THERMOSTATS $3,930 $0 n/a
CL2111 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $512 $0 n/a
CL2110 # 04 Y:2021 04 2021 INSTALL TIMERS AND/OR THERMOSTATS $607 $0 n/a
CL2110 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,493 $18,147 n/a
CL2110 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $5,721 $4,908 n/a
CL2110 # 03 Y:2021 03 2021 USE PHOTOCELL CONTROLS $295 $60 n/a
CL2110 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,030 $0 n/a
CL2110 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,104 $0 n/a
CL2110 # 07 Y:2021 07 2021 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $8,000 $0 n/a