Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,456
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0189 # 04 Y:1990 | 04 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,170 | $200 | Implemented |
CO0189 # 05 Y:1990 | 05 | 1990 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,100 | $3,200 | Implemented |
CO0189 # 06 Y:1990 | 06 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $800 | $500 | Implemented |
CO0189 # 07 Y:1990 | 07 | 1990 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $230 | $300 | Implemented |
CO0190 # 01 Y:1990 | 01 | 1990 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $18,396 | $4,200 | Not Implemented |
CO0190 # 02 Y:1990 | 02 | 1990 | INSTALL TIMERS AND/OR THERMOSTATS | $12,172 | $3,000 | Implemented |
CO0190 # 03 Y:1990 | 03 | 1990 | SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS | $12,764 | $20,000 | Implemented |
CO0190 # 04 Y:1990 | 04 | 1990 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,341 | $8,200 | Not Implemented |
CO0190 # 05 Y:1990 | 05 | 1990 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,432 | $10,800 | Implemented |
CO0190 # 06 Y:1990 | 06 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,041 | $3,783 | Implemented |
CO0190 # 07 Y:1990 | 07 | 1990 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,555 | $2,000 | Implemented |
CO0190 # 08 Y:1990 | 08 | 1990 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,871 | $1,998 | Implemented |
CO0190 # 09 Y:1990 | 09 | 1990 | OPERATE BOILERS ON HIGH FIRE SETTING | $2,147 | $6,000 | Not Implemented |
CO0190 # 10 Y:1990 | 10 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,910 | $3,708 | Implemented |
CO0190 # 11 Y:1990 | 11 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,544 | $300 | Implemented |
CO0190 # 12 Y:1990 | 12 | 1990 | INSULATE BARE EQUIPMENT | $492 | $103 | Implemented |
CO0186 # 01 Y:1990 | 01 | 1990 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $21,069 | $250 | Implemented |
CO0186 # 02 Y:1990 | 02 | 1990 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $15,600 | $4,000 | Implemented |
CO0186 # 03 Y:1990 | 03 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,600 | $1,000 | Implemented |
CO0186 # 04 Y:1990 | 04 | 1990 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,720 | $2,000 | Implemented |
CO0186 # 05 Y:1990 | 05 | 1990 | INSTALL TIMERS AND/OR THERMOSTATS | $1,240 | $600 | Not Implemented |
CO0186 # 06 Y:1990 | 06 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,110 | $2,000 | Implemented |
CO0186 # 07 Y:1990 | 07 | 1990 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $665 | $100 | Implemented |
CO0186 # 08 Y:1990 | 08 | 1990 | INSTALL / REPAIR INSULATION ON STEAM LINES | $331 | $800 | Implemented |
CO0186 # 09 Y:1990 | 09 | 1990 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,400 | $3,550 | Implemented |