IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,456

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0078 # 07 Y:1986 07 1986 REDESIGN PROCESS $112,427 $120,000 Not Implemented
CO0079 # 01 Y:1986 01 1986 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $1,207,312 $5,000,000 Not Implemented
CO0079 # 02 Y:1986 02 1986 IMPROVE LUBRICATION PRACTICES $56,931 $0 Implemented
CO0079 # 03 Y:1986 03 1986 INSULATE BARE EQUIPMENT $43,492 $37,500 Not Implemented
CO0079 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $26,207 $7,000 Implemented
CO0079 # 05 Y:1986 05 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,012 $12,000 Implemented
CO0079 # 06 Y:1986 06 1986 INSTALL TIMERS AND/OR THERMOSTATS $3,423 $46 Implemented
CO0079 # 07 Y:1986 07 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,097 $3,098 Implemented
CO0079 # 08 Y:1986 08 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,816 $1,000 Implemented
CO0071 # 01 Y:1986 01 1986 INCREASE AMOUNT OF CONDENSATE RETURNED $7,253 $150 Implemented
CO0071 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,654 $300 Implemented
CO0071 # 03 Y:1986 03 1986 IMPROVE LUBRICATION PRACTICES $4,524 $0 Implemented
CO0071 # 04 Y:1986 04 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,159 $1,800 Not Implemented
CO0071 # 05 Y:1986 05 1986 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $6,121 $6,000 Not Implemented
CO0071 # 06 Y:1986 06 1986 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,221 $800 Not Implemented
CO0071 # 07 Y:1986 07 1986 REPAIR AND ELIMINATE STEAM LEAKS $4,895 $300 Implemented
CO0071 # 08 Y:1986 08 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,811 $150 Implemented
CO0071 # 09 Y:1986 09 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $2,116 $820 Implemented
CO0071 # 10 Y:1986 10 1986 INSULATE BARE EQUIPMENT $493 $560 Implemented
CO0071 # 11 Y:1986 11 1986 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,185 $450 Implemented
CO0071 # 12 Y:1986 12 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $518 $500 Implemented
CO0071 # 13 Y:1986 13 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $86 $0 Implemented
CO0071 # 14 Y:1986 14 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,747 $30,000 Not Implemented
CO0071 # 15 Y:1986 15 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,387 $3,222 Implemented
CO0072 # 01 Y:1986 01 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $27,672 $75,000 Implemented