Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,456
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0035 # 02 Y:1985 | 02 | 1985 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,285 | $2,000 | Implemented |
CO0035 # 03 Y:1985 | 03 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $100 | $20 | Implemented |
CO0035 # 04 Y:1985 | 04 | 1985 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,959 | $4,000 | Implemented |
CO0035 # 05 Y:1985 | 05 | 1985 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $1,596 | $24 | Implemented |
CO0035 # 06 Y:1985 | 06 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,229 | $6,000 | Implemented |
CO0035 # 07 Y:1985 | 07 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,638 | $4,302 | Implemented |
CO0030 # 01 Y:1985 | 01 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,761 | $300 | Implemented |
CO0030 # 02 Y:1985 | 02 | 1985 | INSTALL TURBULATORS | $4,405 | $400 | Implemented |
CO0030 # 03 Y:1985 | 03 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,575 | $10,000 | Not Implemented |
CO0030 # 04 Y:1985 | 04 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $14,492 | $3,000 | Implemented |
CO0030 # 05 Y:1985 | 05 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,420 | $1,072 | Implemented |
CO0030 # 06 Y:1985 | 06 | 1985 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $751 | $400 | Implemented |
CO0030 # 07 Y:1985 | 07 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $730 | $200 | Implemented |
CO0030 # 08 Y:1985 | 08 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,640 | $1,485 | Implemented |
CO0030 # 09 Y:1985 | 09 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,211 | $350 | Implemented |
CO0031 # 01 Y:1985 | 01 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,774 | $300 | Implemented |
CO0031 # 02 Y:1985 | 02 | 1985 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,968 | $58,000 | Not Implemented |
CO0031 # 03 Y:1985 | 03 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $11,624 | $1,200 | Not Implemented |
CO0031 # 04 Y:1985 | 04 | 1985 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $9,585 | $15,000 | Not Implemented |
CO0031 # 05 Y:1985 | 05 | 1985 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,602 | $10,000 | Not Implemented |
CO0031 # 06 Y:1985 | 06 | 1985 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $920 | $250 | Implemented |
CO0031 # 07 Y:1985 | 07 | 1985 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $3,892 | $600 | Not Implemented |
CO0032 # 01 Y:1985 | 01 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $816 | $500 | Not Implemented |
CO0032 # 02 Y:1985 | 02 | 1985 | SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS | $816 | $2,000 | Implemented |
CO0032 # 03 Y:1985 | 03 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $4,062 | $596 | Not Implemented |