Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,456
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0553 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,930 | $20,520 | Not Implemented |
CO0553 # 06 Y:2004 | 06 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,620 | $15,230 | Not Implemented |
CO0553 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $360 | $520 | Not Implemented |
CO0552 # 01 Y:2004 | 01 | 2004 | INSULATE BARE EQUIPMENT | $47,960 | $7,780 | Not Implemented |
CO0552 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,570 | $620 | Implemented |
CO0552 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,520 | $270 | Not Implemented |
CO0552 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $834 | $560 | Implemented |
CO0552 # 05 Y:2004 | 05 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,500 | $3,050 | Implemented |
CO0552 # 06 Y:2004 | 06 | 2004 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $14,250 | $71,200 | Not Implemented |
CO0552 # 07 Y:2004 | 07 | 2004 | RECOVER AND REUSE COOLING WATER | $4,170 | $20,000 | Not Implemented |
CO0552 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $950 | $2,800 | Not Implemented |
CO0551 # 01 Y:2004 | 01 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,340 | $4,280 | Not Implemented |
CO0551 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,230 | $60 | Implemented |
CO0551 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $910 | $320 | Implemented |
CO0551 # 04 Y:2004 | 04 | 2004 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $190 | $750 | Not Implemented |
CO0551 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,300 | $13,550 | Not Implemented |
CO0551 # 06 Y:2004 | 06 | 2004 | INSTALL OCCUPANCY SENSORS | $510 | $300 | Not Implemented |
CO0551 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $140 | $390 | Not Implemented |
CO0550 # 01 Y:2004 | 01 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,960 | $2,000 | Implemented |
CO0550 # 02 Y:2004 | 02 | 2004 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $1,720 | $6,070 | Not Implemented |
CO0550 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,000 | $180 | Implemented |
CO0550 # 04 Y:2004 | 04 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $590 | $3,520 | Implemented |
CO0550 # 05 Y:2004 | 05 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $490 | $0 | Not Implemented |
CO0550 # 06 Y:2004 | 06 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,160 | $23,870 | Not Implemented |
CO0550 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,040 | $77,000 | Not Implemented |