IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

180

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0143 # 02 Y:1989 02 1989 DIRECT WARMEST AIR TO COMBUSTION INTAKE $7,709 $3,000 Not Implemented
CO0143 # 03 Y:1989 03 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,778 $1,200 Implemented
CO0143 # 04 Y:1989 04 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $9,866 $15,850 Implemented
CO0143 # 05 Y:1989 05 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,427 $1,373 Implemented
CO0143 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28 $92 Implemented
CO0081 # 01 Y:1987 01 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,351 $200 Implemented
CO0081 # 02 Y:1987 02 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,685 $300 Implemented
CO0081 # 03 Y:1987 03 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,132 $0 Implemented
CO0081 # 04 Y:1987 04 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $4,887 $15,000 Implemented
CO0081 # 05 Y:1987 05 1987 OPTIMIZE PLANT POWER FACTOR $1,533 $3,931 Implemented
CO0081 # 06 Y:1987 06 1987 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $3,316 $0 Not Implemented
CO0078 # 01 Y:1986 01 1986 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $20,490 $100,000 Not Implemented
CO0078 # 02 Y:1986 02 1986 OPTIMIZE PLANT POWER FACTOR $6,480 $2,459 Implemented
CO0078 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,055 $1,000 Implemented
CO0078 # 04 Y:1986 04 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $20,746 $3,000 Implemented
CO0078 # 05 Y:1986 05 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,242 $300 Implemented
CO0078 # 06 Y:1986 06 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,730 $1,000 Not Implemented
CO0078 # 07 Y:1986 07 1986 REDESIGN PROCESS $112,427 $120,000 Not Implemented
CO0040 # 01 Y:1985 01 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $253 $250 Implemented
CO0040 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $666 $500 Implemented
CO0040 # 03 Y:1985 03 1985 INSTALL TIMERS AND/OR THERMOSTATS $4,591 $200 Implemented
CO0040 # 04 Y:1985 04 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $475 $534 Implemented
CO0040 # 05 Y:1985 05 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,363 $200 Not Implemented
CO0040 # 06 Y:1985 06 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,589 $300 Implemented
CO0040 # 07 Y:1985 07 1985 INSTALL TURBULATORS $1,268 $500 Implemented