Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,456
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0454 # 06 Y:1999 | 06 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $392 | $0 | Implemented |
CO0454 # 07 Y:1999 | 07 | 1999 | MINIMIZE WATER USAGE | $1,480 | $640 | Not Implemented |
CO0454 # 08 Y:1999 | 08 | 1999 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $350 | $490 | Implemented |
CO0452 # 01 Y:1999 | 01 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,650 | $5,000 | n/a |
CO0452 # 02 Y:1999 | 02 | 1999 | REDUCE VENTILATION AIR | $1,860 | $1,000 | n/a |
CO0452 # 03 Y:1999 | 03 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $310 | $290 | n/a |
CO0452 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10 | $0 | n/a |
CO0452 # 05 Y:1999 | 05 | 1999 | USE A RAG RECYCLE SERVICE | $350 | $0 | n/a |
CO0452 # 06 Y:1999 | 06 | 1999 | COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES | $140 | $0 | n/a |
CO0452 # 07 Y:1999 | 07 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $130 | $0 | n/a |
CO0451 # 01 Y:1999 | 01 | 1999 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,190 | $6,250 | Not Implemented |
CO0451 # 02 Y:1999 | 02 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,080 | $4,000 | Implemented |
CO0451 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $220 | $20 | Implemented |
CO0451 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $190 | $320 | Implemented |
CO0451 # 05 Y:1999 | 05 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $20 | $0 | Not Implemented |
CO0449 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,410 | $66,360 | Implemented |
CO0449 # 02 Y:1999 | 02 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,830 | $10,000 | Implemented |
CO0449 # 03 Y:1999 | 03 | 1999 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $3,030 | $500 | Not Implemented |
CO0449 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $700 | $280 | Implemented |
CO0449 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $60 | $0 | Implemented |
CO0449 # 06 Y:1999 | 06 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $18,110 | $3,600 | Implemented |
CO0449 # 07 Y:1999 | 07 | 1999 | PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) | $2,550 | $1,100 | Implemented |
CO0449 # 08 Y:1999 | 08 | 1999 | USE EVAPORATION TO CONCENTRATE MATERIAL | $1,160 | $3,300 | Implemented |
CO0449 # 09 Y:1999 | 09 | 1999 | REDUCE DEFECTS BY REDUCING PRODUCT TIPPING | $8,960 | $620 | Implemented |
CO0450 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,280 | $60,960 | Not Implemented |