Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0606 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,100 $60 Implemented
CO0606 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,630 $69,110 Implemented
CO0606 # 04 Y:2007 04 2007 USE EVAPORATION TO CONCENTRATE MATERIAL $1,060 $3,000 Not Implemented
CO0606 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,080 $13,670 Implemented
CO0606 # 08 Y:2007 08 2007 INSTALL OCCUPANCY SENSORS $1,890 $9,180 Implemented
CO0606 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,790 $10,000 Implemented
CO0606 # 03 Y:2007 03 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,150 $2,680 Implemented
CO0606 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,880 $620 Implemented
CO0599 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $340 $540 Implemented
CO0599 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,790 $10,600 Implemented
CO0599 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,550 $730 Implemented
CO0599 # 01 Y:2007 01 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $534 $1,998 Not Implemented
CO0599 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,680 $11,760 Not Implemented
CO0599 # 03 Y:2007 03 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $230 $460 Implemented
CO0451 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,080 $4,000 Implemented
CO0451 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $190 $320 Implemented
CO0451 # 05 Y:1999 05 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $20 $0 Not Implemented
CO0451 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $220 $20 Implemented
CO0451 # 01 Y:1999 01 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $7,190 $6,250 Not Implemented
CO0372 # 10 Y:1996 10 1996 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $540 $500 Not Implemented
CO0372 # 09 Y:1996 09 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,080 $1,780 Implemented
CO0372 # 01 Y:1996 01 1996 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $6,270 $13,320 Implemented
CO0372 # 04 Y:1996 04 1996 RECOVER AND REUSE COOLING WATER $2,320 $3,900 Implemented
CO0372 # 06 Y:1996 06 1996 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,940 $800 Not Implemented
CO0372 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $375 $693 Implemented