IAC logo
IAC Assessment: CO0372
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0372
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1996
Principal Product egg products
NAICS n/a
SIC 2013 - Sausages And Other Prepared Meats
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 57,000
Annual Production 19,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $118,307 4,930,832 kWh $0.02
Electricity Demand $150,451 12,036 kW-months/year $12.50
Electricity Fees $(-2) - $ -
Natural Gas $254,537 94,340 MMBtu $2.70
TOTAL ENERGY COSTS $536,173
RECOMMENDED SAVINGS* $23,645 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,805
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$6,270
Cost:
$13,320
$(-430) (-18,171) $(-1,570) (-125) - - $8,270 2,952,000 $(-430)
(-18,171)
kWh
$(-1,570)
(-125)
kW-months/year
-
-
MMBtu
$8,270
2,952,000
Tgal
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$6,250
Cost:
$1,500
- - - - $6,250 2,351 - - -
-
kWh
-
-
kW-months/year
$6,250
2,351
MMBtu
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,740
Cost:
$3,135
$765 31,946 $975 78 - - - - $765
31,946
kWh
$975
78
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$2,320
Cost:
$3,900
- - - - - - $2,320 829,400 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,320
829,400
Tgal
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$375
Cost:
$693
$165 7,034 $210 17 - - - - $165
7,034
kWh
$210
17
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$1,940
Cost:
$800
- - - - $1,940 729 - - -
-
kWh
-
-
kW-months/year
$1,940
729
MMBtu
-
-
Tgal
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,770
Cost:
$740
$740 31,067 $1,030 82 - - - - $740
31,067
kWh
$1,030
82
kW-months/year
-
-
MMBtu
-
-
Tgal
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,360
Cost:
$1,600
$340 14,068 $1,020 82 - - - - $340
14,068
kWh
$1,020
82
kW-months/year
-
-
MMBtu
-
-
Tgal
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,080
Cost:
$1,780
$540 22,567 $540 43 - - - - $540
22,567
kWh
$540
43
kW-months/year
-
-
MMBtu
-
-
Tgal
10: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$540
Cost:
$500
- - - - $540 203 - - -
-
kWh
-
-
kW-months/year
$540
203
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$23,645
Cost:
$27,968
$2,120 88,511 $2,205 177 $8,730 3,283 $10,590 3,781,400 $2,120
88,511
kWh
$2,205
177
kW-months/year
$8,730
3,283
MMBtu
$10,590
3,781,400
Tgal
TOTAL IMPLEMENTED Savings:
$19,805
Cost:
$25,068
$1,780 74,443 $1,185 95 $6,250 2,351 $10,590 3,781,400 $1,780
74,443
kWh
$1,185
95
kW-months/year
$6,250
2,351
MMBtu
$10,590
3,781,400
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal