IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

123

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0119 # 04 Y:2021 04 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,741 $613 Not Implemented
CW0119 # 05 Y:2021 05 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,381 $6,000 Implemented
CW0119 # 06 Y:2021 06 2021 IMPROVE LUBRICATION PRACTICES $21,048 $10,400 Not Implemented
CW0119 # 07 Y:2021 07 2021 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $5,837 $1,000 Implemented
CW0118 # 01 Y:2021 01 2021 INSULATE BARE EQUIPMENT $65,757 $2,574 Not Implemented
CW0118 # 02 Y:2021 02 2021 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $33,972 $0 Not Implemented
CW0118 # 03 Y:2021 03 2021 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $331 $458 Not Implemented
CW0118 # 04 Y:2021 04 2021 INSTALL OCCUPANCY SENSORS $479 $750 Not Implemented
CW0118 # 05 Y:2021 05 2021 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,306 $0 Not Implemented
CW0118 # 06 Y:2021 06 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $731 $0 Not Implemented
CW0117 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,860 $6,780 Implemented
CW0117 # 02 Y:2020 02 2020 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $20,258 $28,161 Not Implemented
CW0117 # 03 Y:2020 03 2020 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $621 $1,288 Not Implemented
CW0117 # 04 Y:2020 04 2020 HEAT WATER WITH EXHAUST HEAT $1,331 $2,149 Implemented
CW0117 # 05 Y:2020 05 2020 RECYCLE WHITE WATER $2,598 $6,039 Implemented
CW0117 # 06 Y:2020 06 2020 USE A DIFFERENT OR RECYCLED RAW MATERIAL $217,090 $846,410 Implemented
CW0117 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,334 $255 Implemented
CW0117 # 08 Y:2020 08 2020 UPGRADE CONTROLS ON COMPRESSORS $11,576 $32,850 Not Implemented
CW0117 # 09 Y:2020 09 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,222 $15,730 Not Implemented
CW0117 # 10 Y:2020 10 2020 RECOVER WASTE HEAT FROM EQUIPMENT $879 $5,742 Implemented
CW0116 # 01 Y:2020 01 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $342 $1,350 Not Implemented
CW0116 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $752 $70 Implemented
CW0116 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $138 $90 Implemented
CW0116 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $46 $0 Implemented
CW0116 # 05 Y:2020 05 2020 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,030 $19,360 Not Implemented