Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
63
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CW0117 # 10 Y:2020 | 10 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $879 | $5,742 | Implemented |
CW0117 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,860 | $6,780 | Implemented |
CW0117 # 02 Y:2020 | 02 | 2020 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $20,258 | $28,161 | Not Implemented |
CW0117 # 06 Y:2020 | 06 | 2020 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $217,090 | $846,410 | Implemented |
CW0117 # 05 Y:2020 | 05 | 2020 | RECYCLE WHITE WATER | $2,598 | $6,039 | Implemented |
CW0117 # 08 Y:2020 | 08 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $11,576 | $32,850 | Not Implemented |
CW0117 # 07 Y:2020 | 07 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,334 | $255 | Implemented |
CW0117 # 04 Y:2020 | 04 | 2020 | HEAT WATER WITH EXHAUST HEAT | $1,331 | $2,149 | Implemented |
CW0117 # 09 Y:2020 | 09 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,222 | $15,730 | Not Implemented |
CW0117 # 03 Y:2020 | 03 | 2020 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $621 | $1,288 | Not Implemented |
CW0116 # 02 Y:2020 | 02 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $752 | $70 | Implemented |
CW0116 # 07 Y:2020 | 07 | 2020 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $438 | $0 | Implemented |
CW0116 # 06 Y:2020 | 06 | 2020 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $3,657 | $2,615 | Not Implemented |
CW0116 # 05 Y:2020 | 05 | 2020 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,030 | $19,360 | Not Implemented |
CW0116 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $46 | $0 | Implemented |
CW0116 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $138 | $90 | Implemented |
CW0116 # 01 Y:2020 | 01 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $342 | $1,350 | Not Implemented |
CW0115 # 01 Y:2020 | 01 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $186 | $1,350 | Not Implemented |
CW0115 # 08 Y:2020 | 08 | 2020 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,017 | $10,620 | Implemented |
CW0115 # 02 Y:2020 | 02 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $1,893 | $10,137 | Not Implemented |
CW0115 # 07 Y:2020 | 07 | 2020 | INSTALL SPECTRAL REFLECTORS / DELAMP | $221 | $250 | Not Implemented |
CW0115 # 06 Y:2020 | 06 | 2020 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $28 | $188 | Implemented |
CW0115 # 05 Y:2020 | 05 | 2020 | RECOVER AND REUSE COOLING WATER | $3,922 | $10,595 | Not Implemented |
CW0115 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $333 | $90 | Implemented |
CW0115 # 03 Y:2020 | 03 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $233 | $22 | Implemented |