Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,008
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0239 # 08 Y:2024 | 08 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $42,185 | $51,431 | n/a |
DL0239 # 05 Y:2024 | 05 | 2024 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $9,543 | $2,247 | n/a |
DL0239 # 07 Y:2024 | 07 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $61,587 | $28,225 | n/a |
DL0239 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $397,405 | $140,000 | n/a |
DL0239 # 09 Y:2024 | 09 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $44,586 | $1,934 | n/a |
DL0239 # 01 Y:2024 | 01 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $17,306 | $1,250 | n/a |
DL0239 # 04 Y:2024 | 04 | 2024 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $61,029 | $10,000 | n/a |
DL0239 # 02 Y:2024 | 02 | 2024 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $6,623 | $17,500 | n/a |
DL0239 # 03 Y:2024 | 03 | 2024 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $37,050 | $110,000 | n/a |
DL0238 # 05 Y:2024 | 05 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $40,888 | $180,000 | n/a |
DL0238 # 04 Y:2024 | 04 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $112,874 | $37,000 | n/a |
DL0238 # 06 Y:2024 | 06 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $56,437 | $22,000 | n/a |
DL0238 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $21,276 | $7,300 | n/a |
DL0238 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $205,595 | $34,400 | n/a |
DL0238 # 07 Y:2024 | 07 | 2024 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $212,600 | $900,000 | n/a |
DL0238 # 01 Y:2024 | 01 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $236,055 | $1,860,000 | n/a |
DL0237 # 06 Y:2024 | 06 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,985 | $4,000 | n/a |
DL0237 # 02 Y:2024 | 02 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,667 | $0 | n/a |
DL0237 # 03 Y:2024 | 03 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,998 | $0 | n/a |
DL0237 # 08 Y:2024 | 08 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $333 | $252 | n/a |
DL0237 # 07 Y:2024 | 07 | 2024 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $682 | $4,000 | n/a |
DL0237 # 04 Y:2024 | 04 | 2024 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,180 | $64 | n/a |
DL0237 # 01 Y:2024 | 01 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,341 | $0 | n/a |
DL0237 # 05 Y:2024 | 05 | 2024 | REDUCE VENTILATION AIR | $1,145 | $270 | n/a |
DL0237 # 09 Y:2024 | 09 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,873 | $30,027 | n/a |