IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

419

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0066 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $2,960 $1,035 Implemented
DL0066 # 02 Y:2011 02 2011 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $101,455 $36,300 Not Implemented
DL0066 # 03 Y:2011 03 2011 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,460 $2,000 Implemented
DL0066 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,015 $4,000 Implemented
DL0066 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,701 $1,257 Not Implemented
DL0066 # 06 Y:2011 06 2011 UPGRADE CONTROLS ON COMPRESSORS $12,600 $10,000 Not Implemented
DL0066 # 07 Y:2011 07 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,163 $3,750 Not Implemented
DL0050 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,623 $100 Not Implemented
DL0050 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,070 $300 Implemented
DL0050 # 03 Y:2010 03 2010 INSTALL SET-BACK TIMERS $1,236 $300 Not Implemented
DL0050 # 04 Y:2010 04 2010 COVER OPEN TANKS $263 $275 Not Implemented
DL0050 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,850 $34,600 Implemented
DL0051 # 01 Y:2010 01 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,124 $0 Implemented
DL0051 # 02 Y:2010 02 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $573 $0 Implemented
DL0051 # 03 Y:2010 03 2010 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $940 $30 Implemented
DL0051 # 04 Y:2010 04 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,500 $100 Implemented
DL0051 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $860 $150 Not Implemented
DL0051 # 06 Y:2010 06 2010 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $4,250 $960 Not Implemented
DL0051 # 07 Y:2010 07 2010 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $4,473 $3,840 Not Implemented
DL0051 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,720 $20,796 Not Implemented
DL0051 # 09 Y:2010 09 2010 REPLACE BOILER $6,600 $16,743 Implemented
DL0046 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $4,503 $0 Not Implemented
DL0046 # 02 Y:2010 02 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $2,940 $0 Not Implemented
DL0046 # 03 Y:2010 03 2010 INSULATE BARE EQUIPMENT $7,292 $520 Not Implemented
DL0046 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,168 $1,500 Implemented