IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,133

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0071 # 05 Y:2011 05 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,970 $2,390 Not Implemented
DL0071 # 06 Y:2011 06 2011 INSULATE BARE EQUIPMENT $430 $180 Not Implemented
DL0071 # 07 Y:2011 07 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $710 $100 Implemented
DL0071 # 08 Y:2011 08 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $590 $2,484 Implemented
DL0071 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,676 $1,800 Not Implemented
DL0071 # 10 Y:2011 10 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,668 $2,500 Implemented
DL0071 # 11 Y:2011 11 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,960 $4,000 Implemented
DL0073 # 01 Y:2011 01 2011 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $904,000 $2,850,000 Not Implemented
DL0073 # 02 Y:2011 02 2011 REPLACE BOILER $420,000 $408,000 Not Implemented
DL0073 # 03 Y:2011 03 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $19,700 $6,400 Not Implemented
DL0070 # 01 Y:2011 01 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $136,635 $120,000 Implemented
DL0070 # 02 Y:2011 02 2011 REDUCE VENTILATION AIR $12,200 $200 Implemented
DL0070 # 03 Y:2011 03 2011 REDUCE VENTILATION AIR $2,160 $45 Not Implemented
DL0070 # 04 Y:2011 04 2011 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $14,330 $500 Implemented
DL0070 # 05 Y:2011 05 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,782 $1,800 Not Implemented
DL0070 # 06 Y:2011 06 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $104,177 $157,000 Implemented
DL0070 # 07 Y:2011 07 2011 USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING $4,600 $10,000 Not Implemented
DL0070 # 08 Y:2011 08 2011 MODERATE COOLING TOWER OUTLET TEMPERATURE $21,528 $52,000 Implemented
DL0070 # 09 Y:2011 09 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,701 $10,500 Not Implemented
DL0070 # 10 Y:2011 10 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $33,730 $1,035,000 Not Implemented
DL0069 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $95,600 $21,215 Not Implemented
DL0069 # 01 Y:2011 01 2011 REDUCE VENTILATION AIR $96,600 $149,350 Implemented
DL0069 # 02 Y:2011 02 2011 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $36,000 $1,000 Implemented
DL0069 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,000 $11,000 Not Implemented
DL0069 # 04 Y:2011 04 2011 COVER OPEN TANKS $36,600 $9,390 Not Implemented