Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
400
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0127 # 06 Y:2014 | 06 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $28,400 | $2,100 | Not Implemented |
DL0127 # 07 Y:2014 | 07 | 2014 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $15,300 | $5,700 | Not Implemented |
DL0127 # 08 Y:2014 | 08 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,900 | $13,000 | Not Implemented |
DL0127 # 09 Y:2014 | 09 | 2014 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,800 | $250 | Implemented |
DL0127 # 10 Y:2014 | 10 | 2014 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,900 | $3,200 | Not Implemented |
DL0127 # 11 Y:2014 | 11 | 2014 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $7,900 | $5,200 | Not Implemented |
DL0127 # 12 Y:2014 | 12 | 2014 | INSTALL OCCUPANCY SENSORS | $3,400 | $2,300 | Implemented |
DL0125 # 01 Y:2014 | 01 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $49,900 | $5,000 | Implemented |
DL0125 # 02 Y:2014 | 02 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,400 | $4,500 | Implemented |
DL0125 # 03 Y:2014 | 03 | 2014 | IMPROVE COMBUSTION CONTROL CAPABILITY | $43,100 | $100 | Not Implemented |
DL0125 # 04 Y:2014 | 04 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,500 | $1,500 | Implemented |
DL0125 # 05 Y:2014 | 05 | 2014 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $18,400 | $5,000 | Not Implemented |
DL0125 # 06 Y:2014 | 06 | 2014 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $5,900 | $100 | Not Implemented |
DL0125 # 07 Y:2014 | 07 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,000 | $10,600 | Not Implemented |
DL0125 # 08 Y:2014 | 08 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $14,500 | $3,000 | Not Implemented |
DL0125 # 09 Y:2014 | 09 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,400 | $7,500 | Not Implemented |
DL0125 # 10 Y:2014 | 10 | 2014 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $36,000 | $126,000 | Not Implemented |
DL0124 # 01 Y:2014 | 01 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $16,900 | $0 | Implemented |
DL0124 # 02 Y:2014 | 02 | 2014 | USE OPTIMUM TEMPERATURE | $490 | $0 | Implemented |
DL0124 # 03 Y:2014 | 03 | 2014 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $340 | $0 | Not Implemented |
DL0124 # 04 Y:2014 | 04 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $700 | $180 | Not Implemented |
DL0124 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,680 | $0 | Implemented |
DL0124 # 06 Y:2014 | 06 | 2014 | INSTALL OCCUPANCY SENSORS | $691 | $900 | Not Implemented |
DL0124 # 07 Y:2014 | 07 | 2014 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $760 | $1,220 | Not Implemented |
DL0124 # 08 Y:2014 | 08 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,125 | $0 | Implemented |