IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

407

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0217 # 08 Y:2023 08 2023 REDUCE VENTILATION AIR $1,715 $750 Implemented
DL0217 # 09 Y:2023 09 2023 RECOVER WASTE HEAT FROM EQUIPMENT $5,708 $15,000 Not Implemented
DL0217 # 10 Y:2023 10 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,110 $5,000 Not Implemented
DL0217 # 11 Y:2023 11 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,318 $4,100 Implemented
DL0217 # 12 Y:2023 12 2023 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $6,950 $25,000 Not Implemented
DL0217 # 13 Y:2023 13 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,390 $11,744 Not Implemented
DL0215 # 01 Y:2023 01 2023 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $29,690 $0 Not Implemented
DL0215 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $125,900 $30,000 Not Implemented
DL0215 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $222,700 $184,000 Implemented
DL0215 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $17,640 $3,000 Implemented
DL0215 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $131,800 $250,000 Not Implemented
DL0215 # 06 Y:2023 06 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,033 $38,000 Not Implemented
DL0215 # 07 Y:2023 07 2023 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $11,998 $52,900 Not Implemented
DL0213 # 01 Y:2022 01 2022 ADJUST BURNERS FOR EFFICIENT OPERATION $81,353 $115,000 Implemented
DL0213 # 02 Y:2022 02 2022 INSULATE BARE EQUIPMENT $50,015 $22,860 Not Implemented
DL0213 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,425 $18,000 Not Implemented
DL0213 # 04 Y:2022 04 2022 REPAIR OR REPLACE STEAM TRAPS $92,874 $102,000 Implemented
DL0199 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,226 $0 Implemented
DL0199 # 02 Y:2021 02 2021 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,784 $0 Implemented
DL0199 # 03 Y:2021 03 2021 REPAIR FAULTY LOUVERS AND DAMPERS $2,440 $2,275 Not Implemented
DL0199 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,657 $1,514 Implemented
DL0199 # 05 Y:2021 05 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $341 $805 Not Implemented
DL0199 # 06 Y:2021 06 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $296 $20 Not Implemented
DL0199 # 07 Y:2021 07 2021 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $280 $1,170 Not Implemented
DL0199 # 08 Y:2021 08 2021 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $272 $1,000 Not Implemented