IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0083 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $9,950 $100 Implemented
DL0083 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,960 $5,400 Implemented
DL0083 # 05 Y:2012 05 2012 RECOVER WASTE HEAT FROM EQUIPMENT $465 $2,100 Not Implemented
DL0083 # 06 Y:2012 06 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,920 $4,750 Implemented
DL0083 # 07 Y:2012 07 2012 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $12,480 $2,500 Not Implemented
DL0083 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,964 $28,300 Not Implemented
DL0083 # 09 Y:2012 09 2012 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,190 $150 Not Implemented
DL0083 # 10 Y:2012 10 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $1,050 $100 Implemented
DL0083 # 11 Y:2012 11 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $600 $100 Implemented
DL0083 # 12 Y:2012 12 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $300 $100 Implemented
DL0082 # 01 Y:2012 01 2012 REDUCE VENTILATION AIR $64,179 $280,000 Not Implemented
DL0082 # 02 Y:2012 02 2012 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $18,536 $46,000 Not Implemented
DL0082 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,641 $1,330 Implemented
DL0082 # 04 Y:2012 04 2012 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $716 $90 Implemented
DL0082 # 05 Y:2012 05 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,636 $2,100 Not Implemented
DL0081 # 01 Y:2012 01 2012 UPGRADE CONTROLS ON COMPRESSORS $323,076 $500,000 Not Implemented
DL0081 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $51,870 $24,400 Implemented
DL0081 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,801 $36,000 Implemented
DL0081 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,818 $54,000 Implemented
DL0081 # 05 Y:2012 05 2012 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $18,222 $42,000 Not Implemented
DL0081 # 06 Y:2012 06 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24,850 $4,500 Not Implemented
DL0081 # 07 Y:2012 07 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $28,257 $28,000 Not Implemented
DL0081 # 08 Y:2012 08 2012 IMPROVE COMBUSTION CONTROL CAPABILITY $16,536 $8,900 Not Implemented
DL0081 # 09 Y:2012 09 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $16,536 $25,000 Not Implemented
DL0081 # 10 Y:2012 10 2012 REDUCE VENTILATION AIR $26,354 $4,500 Implemented