IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,871

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0553 # 03 Y:1995 03 1995 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $22,120 $36,400 Not Implemented
GT0553 # 04 Y:1995 04 1995 ISOLATE HOT OR COLD EQUIPMENT $6,865 $2,560 Not Implemented
GT0553 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,018 $4,100 Not Implemented
GT0553 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,590 $7,720 Not Implemented
GT0552 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,000 $208,000 Implemented
GT0552 # 02 Y:1995 02 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,400 $0 Implemented
GT0552 # 03 Y:1995 03 1995 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $77,800 $200,000 Not Implemented
GT0552 # 04 Y:1995 04 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $575 $191 Implemented
GT0552 # 05 Y:1995 05 1995 REPAIR AND ELIMINATE STEAM LEAKS $4,890 $500 Implemented
GT0551 # 01 Y:1995 01 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $65,795 $0 Implemented
GT0551 # 02 Y:1995 02 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $39,160 $80,000 Not Implemented
GT0551 # 03 Y:1995 03 1995 INSTALL AUTOMATIC STACK DAMPER $50,375 $41,900 Implemented
GT0551 # 04 Y:1995 04 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $34,790 $16,500 Implemented
GT0551 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21,276 $87,727 Implemented
GT0551 # 06 Y:1995 06 1995 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $7,840 $0 Not Implemented
GT0549 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,100 $50,690 Implemented
GT0549 # 02 Y:1995 02 1995 DISCONNECT BALLASTS $11,120 $2,895 Implemented
GT0549 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,430 $400 Implemented
GT0549 # 04 Y:1995 04 1995 USE DEMAND CONTROLLER OR LOAD SHEDDER $19,500 $24,000 Implemented
GT0549 # 05 Y:1995 05 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,520 $3,000 Not Implemented
GT0549 # 06 Y:1995 06 1995 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $18,200 $168,000 Implemented
GT0549 # 07 Y:1995 07 1995 USE POWER DURING OFF-PEAK PERIODS $1,830 $4,000 Not Implemented
GT0548 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,060 $350 Implemented
GT0548 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $100 $140 Implemented
GT0548 # 03 Y:1995 03 1995 USE SYNTHETIC LUBRICANT $1,530 $3,400 Implemented