IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,675

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0219 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,271 $1,500 Implemented
HO0219 # 05 Y:2000 05 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,030 $9,000 Not Implemented
HO0219 # 06 Y:2000 06 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,935 $8,000 Implemented
HO0219 # 07 Y:2000 07 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $3,102 $4,641 Implemented
HO0218 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,368 $41,546 Implemented
HO0218 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,628 $1,500 Implemented
HO0218 # 03 Y:2000 03 2000 USE OPTIMUM THICKNESS INSULATION $4,499 $2,640 Implemented
HO0218 # 04 Y:2000 04 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,069 $0 Implemented
HO0218 # 05 Y:2000 05 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $3,825 $5,000 Not Implemented
HO0218 # 06 Y:2000 06 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $5,400 $20,000 Not Implemented
HO0218 # 07 Y:2000 07 2000 RECOVER AND REUSE WASTE MATERIAL $37,179 $0 Implemented
HO0216 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,337 $24,765 Not Implemented
HO0216 # 02 Y:2000 02 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,354 $3,000 Not Implemented
HO0216 # 03 Y:2000 03 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,650 $548 Implemented
HO0216 # 04 Y:2000 04 2000 INSTALL OCCUPANCY SENSORS $11,898 $5,000 Implemented
HO0216 # 05 Y:2000 05 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,645 $10,005 Implemented
HO0216 # 06 Y:2000 06 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $4,569 $0 Not Implemented
HO0216 # 07 Y:2000 07 2000 INSULATE BARE EQUIPMENT $49,535 $11,088 Not Implemented
HO0216 # 08 Y:2000 08 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,726 $4,167 Not Implemented
HO0216 # 09 Y:2000 09 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,665 $222 Implemented
HO0222 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,727 $8,392 Implemented
HO0222 # 02 Y:2000 02 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $15,554 $21,600 Not Implemented
HO0222 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $697 $600 Implemented
HO0222 # 04 Y:2000 04 2000 UPGRADE CONTROLS ON COMPRESSORS $14,666 $0 Not Implemented
HO0222 # 05 Y:2000 05 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $723 $4,000 Implemented