IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,675

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0191 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,826 $120 Implemented
HO0191 # 03 Y:1999 03 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $364 $410 Not Implemented
HO0191 # 04 Y:1999 04 1999 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $875 $400 Implemented
HO0191 # 05 Y:1999 05 1999 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,245 $1,500 Not Implemented
HO0191 # 06 Y:1999 06 1999 INSTALL SYSTEM TO COLLECT SCRAP $4,160 $1,320 Not Implemented
HO0191 # 07 Y:1999 07 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,125 $500 Implemented
HO0191 # 08 Y:1999 08 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $450 $1,000 Implemented
HO0191 # 09 Y:1999 09 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,125 $1,000 Not Implemented
HO0175 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,263 $16,755 Implemented
HO0175 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $3,201 $168 Implemented
HO0175 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $320 $500 Not Implemented
HO0175 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $800 $300 Implemented
HO0175 # 05 Y:1998 05 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $9,375 $0 Implemented
HO0175 # 06 Y:1998 06 1998 CLEAR AND RENT EXISTING SPACE $18,000 $3,000 Implemented
HO0190 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,715 $15,311 Not Implemented
HO0190 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,478 $39,600 Not Implemented
HO0190 # 03 Y:1999 03 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $39,503 $85,000 Not Implemented
HO0190 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,524 $2,500 Implemented
HO0190 # 05 Y:1999 05 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,100 $360 Implemented
HO0189 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,434 $10,179 Implemented
HO0189 # 02 Y:1998 02 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,097 $5,180 Not Implemented
HO0189 # 03 Y:1998 03 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $6,631 $10,500 Implemented
HO0189 # 04 Y:1998 04 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $14,000 $20,000 Not Implemented
HO0189 # 05 Y:1998 05 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $9,400 $500 Implemented
HO0189 # 06 Y:1998 06 1998 MINIMIZE WATER USAGE $2,000 $2,000 Implemented