IAC logo
IAC Assessment: HO0190
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0190
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1999
Principal Product Plastic Products
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 300,000
Annual Production 16,000,000 Pounds
Production Hrs. Annual 8,232
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $493,800 7,566,823 kWh $0.07
Electricity Demand $159,832 17,006 kW-months/year $9.40
Electricity Fees $4,101 - $ -
Natural Gas $18,172 5,898 MMBtu $3.08
TOTAL ENERGY COSTS $675,905
RECOMMENDED SAVINGS* $67,320 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,624
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,715
Cost:
$15,311
$7,798 119,578 $1,917 204 - - $7,798
119,578
kWh
$1,917
204
kW-months/year
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,478
Cost:
$39,600
$9,478 145,076 - - - - $9,478
145,076
kWh
-
-
kW-months/year
-
-
$
03: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$39,503
Cost:
$85,000
$39,503 605,217 - - - - $39,503
605,217
kWh
-
-
kW-months/year
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,524
Cost:
$2,500
$6,219 95,252 $1,305 139 - - $6,219
95,252
kWh
$1,305
139
kW-months/year
-
-
$
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$1,100
Cost:
$360
- - - - $1,100 - -
-
kWh
-
-
kW-months/year
$1,100
-
$
TOTAL RECOMMENDED Savings:
$67,320
Cost:
$142,771
$62,998 965,123 $3,222 343 $1,100 - $62,998
965,123
kWh
$3,222
343
kW-months/year
$1,100
-
$
TOTAL IMPLEMENTED Savings:
$8,624
Cost:
$2,860
$6,219 95,252 $1,305 139 $1,100 - $6,219
95,252
kWh
$1,305
139
kW-months/year
$1,100
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost