IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

396

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0157 # 09 Y:1997 09 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $4,716 $10,000 Implemented
HO0157 # 10 Y:1997 10 1997 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS $31,248 $20,000 Implemented
HO0155 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,138 $9,401 Not Implemented
HO0155 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,489 $1,607 Implemented
HO0155 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,556 $1,000 Implemented
HO0155 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,298 $15,334 Not Implemented
HO0155 # 05 Y:1997 05 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,141 $2,400 Not Implemented
HO0155 # 06 Y:1997 06 1997 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,462 $6,000 Not Implemented
HO0155 # 07 Y:1997 07 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,263 $1,363 Implemented
HO0155 # 08 Y:1997 08 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $5,460 $25,000 Implemented
HO0155 # 09 Y:1997 09 1997 USE HIGH PRESSURE WASH SYSTEMS $33,480 $1,000 Not Implemented
HO0155 # 10 Y:1997 10 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,000 $500 Implemented
HO0155 # 11 Y:1997 11 1997 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $9,500 $100 Implemented
HO0153 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $820 $716 Not Implemented
HO0153 # 02 Y:1997 02 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,194 $3,500 Not Implemented
HO0153 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $913 $800 Not Implemented
HO0153 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $745 $80 Not Implemented
HO0153 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $398 $450 Not Implemented
HO0153 # 06 Y:1997 06 1997 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,671 $8,775 Not Implemented
HO0153 # 07 Y:1997 07 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,949 $1,563 Not Implemented
HO0153 # 08 Y:1997 08 1997 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $4,384 $500 Not Implemented
HO0153 # 09 Y:1997 09 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,962 $6,500 Not Implemented
HO0153 # 10 Y:1997 10 1997 MINIMIZE WATER USAGE $5,074 $500 Not Implemented
HO0153 # 11 Y:1997 11 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $4,738 $10,000 Not Implemented
HO0147 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $163 $260 Not Implemented