Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Hofstra Univ. |
---|---|
Assessment Year | 1997 |
Principal Product | Cable Shielding |
NAICS | n/a |
SIC | 3481 - |
Sales | $10,000,000-$50,000,000 |
# of Employees | 249 |
Plant Area (Sq.Ft.) | 49,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 4,550 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $168,659 | 1,934,056 | kWh | $0.09 |
Electricity Demand | $41,153 | 5,728 | kW-months/year | $7.18 |
Electricity Fees | $4,045 | - | $ | - |
Natural Gas | $43,840 | 7,109 | MMBtu | $6.17 |
TOTAL ENERGY COSTS | $298,897 | |||
RECOMMENDED SAVINGS* | $43,848 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $820 Cost: $716 |
$820 | 9,379 | - | - | - | - | - | - | - | - | - | - | - | - |
$820 9,379 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $10,194 Cost: $3,500 |
- | - | $10,194 | 1,417 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$10,194 1,417 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $913 Cost: $800 |
$750 | 8,499 | $163 | 23 | - | - | - | - | - | - | - | - | - | - |
$750 8,499 kWh |
$163 23 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $745 Cost: $80 |
$684 | 7,034 | $61 | 19 | - | - | - | - | - | - | - | - | - | - |
$684 7,034 kWh |
$61 19 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $398 Cost: $450 |
$358 | 4,103 | $40 | 6 | - | - | - | - | - | - | - | - | - | - |
$358 4,103 kWh |
$40 6 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $2,671 Cost: $8,775 |
$2,194 | 25,205 | $477 | 66 | - | - | - | - | - | - | - | - | - | - |
$2,194 25,205 kWh |
$477 66 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $2,949 Cost: $1,563 |
- | - | - | - | $2,949 | 478 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,949 478 MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE |
Savings: $4,384 Cost: $500 |
- | - | - | - | - | - | - | - | - | - | $4,384 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$4,384 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $10,962 Cost: $6,500 |
- | - | - | - | - | - | - | - | $10,962 | 2,500 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$10,962 2,500 lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.4151 MINIMIZE WATER USAGE |
Savings: $5,074 Cost: $500 |
- | - | - | - | - | - | - | - | - | - | - | - | $5,074 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
$5,074 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $4,738 Cost: $10,000 |
- | - | - | - | $(-62) | (-10) | $4,800 | 750 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$(-62) (-10) MMBtu |
$4,800 750 gal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $43,848 Cost: $33,384 |
$4,806 | 54,220 | $10,935 | 1,531 | $2,887 | 468 | $4,800 | 750 | $10,962 | 2,500 | $4,384 | - | $5,074 | - | $4,806 54,220 kWh |
$10,935 1,531 kW-months/year |
$2,887 468 MMBtu |
$4,800 750 gal |
$10,962 2,500 lb |
$4,384 - $ |
$5,074 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Water Consumption |