IAC logo
IAC Assessment: HO0153
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0153
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1997
Principal Product Cable Shielding
NAICS n/a
SIC 3481 -
Sales $10,000,000-$50,000,000
# of Employees 249
Plant Area (Sq.Ft.) 49,000
Annual Production 0 Units
Production Hrs. Annual 4,550
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $168,659 1,934,056 kWh $0.09
Electricity Demand $41,153 5,728 kW-months/year $7.18
Electricity Fees $4,045 - $ -
Natural Gas $43,840 7,109 MMBtu $6.17
TOTAL ENERGY COSTS $298,897
RECOMMENDED SAVINGS* $43,848 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ Tgal
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$820
Cost:
$716
$820 9,379 - - - - - - - - - - - - $820
9,379
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$10,194
Cost:
$3,500
- - $10,194 1,417 - - - - - - - - - - -
-
kWh
$10,194
1,417
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$913
Cost:
$800
$750 8,499 $163 23 - - - - - - - - - - $750
8,499
kWh
$163
23
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$745
Cost:
$80
$684 7,034 $61 19 - - - - - - - - - - $684
7,034
kWh
$61
19
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$398
Cost:
$450
$358 4,103 $40 6 - - - - - - - - - - $358
4,103
kWh
$40
6
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
06: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$2,671
Cost:
$8,775
$2,194 25,205 $477 66 - - - - - - - - - - $2,194
25,205
kWh
$477
66
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,949
Cost:
$1,563
- - - - $2,949 478 - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,949
478
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
08: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$4,384
Cost:
$500
- - - - - - - - - - $4,384 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$4,384
-
$
-
-
Tgal
09: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$10,962
Cost:
$6,500
- - - - - - - - $10,962 2,500 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$10,962
2,500
lb
-
-
$
-
-
Tgal
10: 3.4151 MINIMIZE WATER USAGE Savings:
$5,074
Cost:
$500
- - - - - - - - - - - - $5,074 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
$5,074
-
Tgal
11: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$4,738
Cost:
$10,000
- - - - $(-62) (-10) $4,800 750 - - - - - - -
-
kWh
-
-
kW-months/year
$(-62)
(-10)
MMBtu
$4,800
750
gal
-
-
lb
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$43,848
Cost:
$33,384
$4,806 54,220 $10,935 1,531 $2,887 468 $4,800 750 $10,962 2,500 $4,384 - $5,074 - $4,806
54,220
kWh
$10,935
1,531
kW-months/year
$2,887
468
MMBtu
$4,800
750
gal
$10,962
2,500
lb
$4,384
-
$
$5,074
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Water Consumption