IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,660

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0437 # 06 Y:2009 06 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,380 $626 Implemented
IA0437 # 07 Y:2009 07 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,416 $500 Not Implemented
IA0437 # 08 Y:2009 08 2009 RECOVER WASTE HEAT FROM EQUIPMENT $4,190 $1,045 Implemented
IA0437 # 09 Y:2009 09 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $986 $216 Implemented
IA0437 # 10 Y:2009 10 2009 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $7,336 $7,337 Not Implemented
IA0437 # 11 Y:2009 11 2009 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $3,292 $2,000 Not Implemented
IA0437 # 12 Y:2009 12 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $16,602 $60,000 Implemented
IA0437 # 13 Y:2009 13 2009 INSULATE BARE EQUIPMENT $5,401 $10,500 Not Implemented
IA0437 # 14 Y:2009 14 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,644 $15,500 Not Implemented
IA0437 # 15 Y:2009 15 2009 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,324 $10,000 Not Implemented
IA0436 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,733 $4,739 Implemented
IA0436 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,163 $1,974 Not Implemented
IA0436 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,522 $52,246 Not Implemented
IA0436 # 04 Y:2009 04 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,802 $1,283 Not Implemented
IA0436 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,400 $1,136 Not Implemented
IA0436 # 06 Y:2009 06 2009 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $10,850 $2,400 Not Implemented
IA0436 # 07 Y:2009 07 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,098 $472 Not Implemented
IA0436 # 08 Y:2009 08 2009 INSTALL OCCUPANCY SENSORS $1,982 $539 Not Implemented
IA0436 # 09 Y:2009 09 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,050 $7,884 Not Implemented
IA0435 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,332 $252 Implemented
IA0435 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,663 $45 Not Implemented
IA0435 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $978 $240 Implemented
IA0435 # 04 Y:2008 04 2008 COVER OPEN TANKS $881 $225 Not Implemented
IA0435 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,079 $36,423 Not Implemented
IA0435 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,172 $1,917 Not Implemented