Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
217
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0284 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $216 | $213 | Implemented |
IA0284 # 04 Y:2001 | 04 | 2001 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $4,016 | $800 | Implemented |
IA0284 # 07 Y:2001 | 07 | 2001 | INSTALL OCCUPANCY SENSORS | $99 | $222 | Not Implemented |
IA0284 # 08 Y:2001 | 08 | 2001 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $19,346 | $43,176 | Not Implemented |
IA0284 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $613 | $159 | Implemented |
IA0284 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,819 | $182 | Implemented |
IA0284 # 06 Y:2001 | 06 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $256 | $633 | Not Implemented |
IA0284 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $394 | $18 | Implemented |
IA0283 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,046 | $509 | Implemented |
IA0283 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,401 | $12,898 | Not Implemented |
IA0283 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $569 | $34 | Implemented |
IA0283 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,741 | $0 | Not Implemented |
IA0283 # 07 Y:2001 | 07 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $354 | $17 | Implemented |
IA0283 # 11 Y:2001 | 11 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $89,568 | $135,000 | Not Implemented |
IA0283 # 12 Y:2001 | 12 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $26,520 | $55,500 | Not Implemented |
IA0283 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $878 | $258 | Implemented |
IA0283 # 08 Y:2001 | 08 | 2001 | INSTALL TURBULATORS | $982 | $912 | Implemented |
IA0283 # 06 Y:2001 | 06 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $543 | $0 | Implemented |
IA0283 # 09 Y:2001 | 09 | 2001 | INSTALL AUTOMATIC PACKING EQUIPMENT | $207,700 | $60,000 | Implemented |
IA0283 # 10 Y:2001 | 10 | 2001 | INSTALL AUTOMATIC PACKING EQUIPMENT | $409,465 | $900,000 | Not Implemented |
IA0282 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,095 | $3,205 | Implemented |
IA0282 # 09 Y:2001 | 09 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $45,760 | $58,400 | n/a |
IA0282 # 07 Y:2001 | 07 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,297 | $1,111 | Not Implemented |
IA0282 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $489 | $174 | Implemented |
IA0282 # 06 Y:2001 | 06 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,255 | $0 | Implemented |