Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
114
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0459 # 07 Y:2010 | 07 | 2010 | REPAIR AND ELIMINATE STEAM LEAKS | $700 | $1,000 | Implemented |
IA0459 # 10 Y:2010 | 10 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,434 | $450 | Not Implemented |
IA0459 # 09 Y:2010 | 09 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,256 | $500 | Implemented |
IA0459 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,460 | $3,923 | Implemented |
IA0459 # 02 Y:2010 | 02 | 2010 | INSTALL OCCUPANCY SENSORS | $1,643 | $1,978 | Not Implemented |
IA0459 # 08 Y:2010 | 08 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,899 | $329 | Implemented |
IA0459 # 04 Y:2010 | 04 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $23,761 | $1,000 | Implemented |
IA0459 # 05 Y:2010 | 05 | 2010 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $7,611 | $1,500 | Not Implemented |
IA0459 # 06 Y:2010 | 06 | 2010 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,057 | $1,500 | Not Implemented |
IA0459 # 03 Y:2010 | 03 | 2010 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $21,406 | $10,000 | Not Implemented |
IA0458 # 02 Y:2010 | 02 | 2010 | INSTALL OCCUPANCY SENSORS | $1,769 | $2,181 | Implemented |
IA0458 # 03 Y:2010 | 03 | 2010 | USE RADIANT HEATER FOR SPOT HEATING | $48,853 | $11,000 | Implemented |
IA0458 # 04 Y:2010 | 04 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,520 | $2,139 | Not Implemented |
IA0458 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,473 | $1,020 | Implemented |
IA0458 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,258 | $25 | Not Implemented |
IA0458 # 08 Y:2010 | 08 | 2010 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $26,636 | $22,000 | Implemented |
IA0458 # 05 Y:2010 | 05 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,683 | $2,050 | Implemented |
IA0458 # 07 Y:2010 | 07 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $816 | $500 | Implemented |
IA0457 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,596 | $995 | Implemented |
IA0457 # 08 Y:2010 | 08 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,163 | $70 | Implemented |
IA0457 # 03 Y:2010 | 03 | 2010 | INSTALL OCCUPANCY SENSORS | $1,389 | $1,210 | Implemented |
IA0457 # 11 Y:2010 | 11 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,841 | $1,000 | Not Implemented |
IA0457 # 04 Y:2010 | 04 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $13,609 | $175 | Not Implemented |
IA0457 # 01 Y:2010 | 01 | 2010 | USE PHOTOCELL CONTROLS | $112 | $420 | Not Implemented |
IA0457 # 07 Y:2010 | 07 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $691 | $752 | Implemented |