IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

685

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0306 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,638 $33,160 Implemented
IC0306 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $158 $432 Implemented
IC0306 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,340 $0 Implemented
IC0305 # 06 Y:2024 06 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,506 $0 Implemented
IC0305 # 12 Y:2024 12 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,840 $2,566 Implemented
IC0305 # 09 Y:2024 09 2024 INSTALL OCCUPANCY SENSORS $677 $0 Implemented
IC0305 # 08 Y:2024 08 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $241 $0 Implemented
IC0305 # 10 Y:2024 10 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,048 $5,899 Implemented
IC0305 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $28,145 $2,500 Implemented
IC0305 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,071 $5,184 Implemented
IC0305 # 07 Y:2024 07 2024 INSULATE BARE EQUIPMENT $1,737 $2,801 Implemented
IC0303 # 11 Y:2024 11 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,164 $0 Implemented
IC0303 # 05 Y:2024 05 2024 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $31,214 $13,640 Implemented
IC0303 # 08 Y:2024 08 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,438 $3,433 Implemented
IC0303 # 13 Y:2024 13 2024 REPAIR OR REPLACE STEAM TRAPS $3,324 $1,624 Implemented
IC0303 # 16 Y:2024 16 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $74,328 $441,248 Implemented
IC0301 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,886 $205 Implemented
IC0301 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,652 $0 Implemented
IC0301 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,042 $205 Implemented
IC0301 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,487 $0 Implemented
IC0301 # 02 Y:2024 02 2024 CONTRACT A WOOD PALLET RECYCLING COMPANY $26,388 $3,600 Implemented
IC0300 # 12 Y:2024 12 2024 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $188 $0 Implemented
IC0300 # 05 Y:2024 05 2024 INSULATE BARE EQUIPMENT $765 $658 Implemented
IC0300 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,452 $129 Implemented
IC0300 # 02 Y:2024 02 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $772 $1,100 Implemented