IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,899

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0318 # 11 Y:2025 11 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,250 $1,159 n/a
IC0318 # 12 Y:2025 12 2025 Install Anaerobic Digester $1,786,748 $9,930,710 n/a
IC0317 # 01 Y:2025 01 2025 INSTALL EFFICIENT RECTIFIERS $6,191 $19,124 Not Implemented
IC0317 # 02 Y:2025 02 2025 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $10,127 $7,240 Implemented
IC0317 # 03 Y:2025 03 2025 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $930 $0 Implemented
IC0317 # 04 Y:2025 04 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $431 $1,113 Not Implemented
IC0317 # 05 Y:2025 05 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,337 $108 Implemented
IC0317 # 06 Y:2025 06 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $704 $0 Implemented
IC0317 # 07 Y:2025 07 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $32,668 $258,530 Not Implemented
IC0317 # 08 Y:2025 08 2025 USE RADIANT HEATER FOR SPOT HEATING $15,053 $20,087 Not Implemented
IC0317 # 09 Y:2025 09 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $972 $2,234 Implemented
IC0317 # 10 Y:2025 10 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $397 $597 Not Implemented
IC0317 # 11 Y:2025 11 2025 INSTALL OCCUPANCY SENSORS $151 $425 Implemented
IC0317 # 12 Y:2025 12 2025 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $11,344 $21,200 Implemented
IC0317 # 13 Y:2025 13 2025 INSULATE BARE EQUIPMENT $2,154 $4,516 Implemented
IC0316 # 01 Y:2025 01 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $89,150 $489,314 Not Implemented
IC0316 # 02 Y:2025 02 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,822 $728 Implemented
IC0316 # 03 Y:2025 03 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $93 $379 Implemented
IC0316 # 04 Y:2025 04 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,450 $3,794 Implemented
IC0316 # 05 Y:2025 05 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,039 $346 Implemented
IC0316 # 06 Y:2025 06 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $198 $144 Implemented
IC0316 # 07 Y:2025 07 2025 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $21,124 $3,628 Not Implemented
IC0316 # 08 Y:2025 08 2025 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,349 $3,386 Implemented
IC0316 # 09 Y:2025 09 2025 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,406 $3,393 Not Implemented
IC0316 # 10 Y:2025 10 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $525 $205 Implemented