IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

183

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0040 # 11 Y:2015 11 2015 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,298 $3,968 Not Implemented
IP0039 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,933 $0 Not Implemented
IP0039 # 02 Y:2015 02 2015 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $6,224 $853 Not Implemented
IP0039 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $330 $128 Not Implemented
IP0039 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,314 $1,524 Not Implemented
IP0039 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,262 $3,790 Not Implemented
IP0039 # 06 Y:2015 06 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $6,679 $6,839 Not Implemented
IP0038 # 01 Y:2015 01 2015 INSTALL TIMERS AND/OR THERMOSTATS $6,356 $73 Implemented
IP0038 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,361 $5,637 Not Implemented
IP0038 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,399 $68,000 Not Implemented
IP0038 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,464 $7,184 Not Implemented
IP0038 # 05 Y:2015 05 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $32,524 $83,652 Not Implemented
IP0038 # 06 Y:2015 06 2015 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,511 $4,122 Not Implemented
IP0038 # 07 Y:2015 07 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,179 $6,803 Not Implemented
IP0038 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $123 $400 Implemented
IP0037 # 01 Y:2015 01 2015 APPLY FOR INVESTMENT INCENTIVES $2,707 $0 Implemented
IP0037 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $267 $0 Not Implemented
IP0037 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,074 $227 Implemented
IP0037 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,417 $113 Implemented
IP0037 # 05 Y:2015 05 2015 $1,364 $171 Not Implemented
IP0037 # 06 Y:2015 06 2015 INSULATE BARE EQUIPMENT $1,469 $211 Not Implemented
IP0037 # 07 Y:2015 07 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,192 $980 Not Implemented
IP0037 # 08 Y:2015 08 2015 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $32,642 $7,996 Implemented
IP0037 # 09 Y:2015 09 2015 RECOVER WASTE HEAT FROM EQUIPMENT $3,490 $1,421 Not Implemented
IP0037 # 10 Y:2015 10 2015 INSTALL OCCUPANCY SENSORS $518 $739 Not Implemented