IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KG0046 # 01 Y:1996 01 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,929 $1,400 Not Implemented
KG0046 # 02 Y:1996 02 1996 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $4,874 $700 Not Implemented
KG0046 # 03 Y:1996 03 1996 INSULATE BARE EQUIPMENT $1,845 $48 Implemented
KG0046 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,157 $365 Implemented
KG0046 # 05 Y:1996 05 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $880 $50 Not Implemented
KG0046 # 06 Y:1996 06 1996 INSTALL TIMERS AND/OR THERMOSTATS $684 $450 Implemented
KG0046 # 07 Y:1996 07 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $455 $500 Implemented
KG0046 # 08 Y:1996 08 1996 INSTALL OCCUPANCY SENSORS $240 $290 Not Implemented
KG0046 # 09 Y:1996 09 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $244 $150 Not Implemented
KG0046 # 10 Y:1996 10 1996 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $3,088 $800 Implemented
KG0046 # 11 Y:1996 11 1996 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $2,130 $300 Implemented
KG0046 # 12 Y:1996 12 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,356 $0 Implemented
KG0046 # 13 Y:1996 13 1996 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $1,437 $0 Implemented
KG0058 # 01 Y:1996 01 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,449 $16,500 Implemented
KG0058 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,585 $6,796 Implemented
KG0058 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,147 $19,100 Not Implemented
KG0058 # 04 Y:1996 04 1996 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $5,489 $60 Not Implemented
KG0058 # 05 Y:1996 05 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,022 $12,000 Implemented
KG0058 # 06 Y:1996 06 1996 USE SYNTHETIC LUBRICANT $2,937 $0 Implemented
KG0058 # 07 Y:1996 07 1996 RECOVER AND REUSE WASTE MATERIAL $8,771 $0 Implemented
KG0058 # 08 Y:1996 08 1996 RECOVER AND REUSE WASTE MATERIAL $4,456 $1,500 Implemented
KG0059 # 01 Y:1996 01 1996 AVOID FROST FORMATION ON EVAPORATORS $65,997 $15,000 Not Implemented
KG0059 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,609 $23,780 Not Implemented
KG0059 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,522 $2,500 Not Implemented
KG0059 # 04 Y:1996 04 1996 TREAT AND REUSE RINSE WATERS $18,341 $2,930 Not Implemented