IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

700

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0329 # 06 Y:1990 06 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,025 $0 Implemented
KU0329 # 07 Y:1990 07 1990 INSULATE BARE EQUIPMENT $3,165 $2,804 Implemented
KU0322 # 02 Y:1990 02 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $16,055 $4,500 Implemented
KU0322 # 03 Y:1990 03 1990 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $653 $250 Implemented
KU0322 # 04 Y:1990 04 1990 INSTALL SET-BACK TIMERS $2,494 $900 Implemented
KU0325 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,200 $3,078 Implemented
KU0325 # 03 Y:1990 03 1990 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $391 $466 Implemented
KU0325 # 05 Y:1990 05 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $675 $1,416 Implemented
KU0325 # 06 Y:1990 06 1990 REDUCE VENTILATION AIR $8,297 $11,700 Implemented
KU0325 # 07 Y:1990 07 1990 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $50,733 $0 Implemented
KU0317 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $862 $206 Implemented
KU0317 # 02 Y:1990 02 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,455 $240 Implemented
KU0317 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,311 $1,400 Implemented
KU0314 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $532 $600 Implemented
KU0314 # 02 Y:1990 02 1990 INCREASE AMOUNT OF CONDENSATE RETURNED $20,739 $22,000 Implemented
KU0314 # 03 Y:1990 03 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $538 $0 Implemented
KU0314 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,014 $1,587 Implemented
KU0314 # 05 Y:1990 05 1990 RECOVER AND REUSE COOLING WATER $5,719 $2,000 Implemented
KU0314 # 07 Y:1990 07 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $306 $150 Implemented
KU0308 # 01 Y:1990 01 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $27,543 $23,000 Implemented
KU0308 # 02 Y:1990 02 1990 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $7,309 $2,500 Implemented
KU0308 # 03 Y:1990 03 1990 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $2,009 $250 Implemented
KU0308 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $665 $80 Implemented
KU0308 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,013 $1,600 Implemented
KU0308 # 07 Y:1990 07 1990 INSTALL AUTOMATIC STACK DAMPER $2,280 $3,000 Implemented