IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,344

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0265 # 06 Y:1988 06 1988 RECOVER WASTE HEAT FROM EQUIPMENT $606 $700 Implemented
KU0265 # 08 Y:1988 08 1988 IMPROVE LUBRICATION PRACTICES $4,120 $0 Implemented
KU0265 # 09 Y:1988 09 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,325 $0 Implemented
KU0265 # 10 Y:1988 10 1988 MINIMIZE WATER USAGE $9,368 $6,400 Implemented
KU0265 # 11 Y:1988 11 1988 RECOVER AND REUSE COOLING WATER $7,327 $6,400 Implemented
KU0266 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $487 $282 Implemented
KU0266 # 02 Y:1988 02 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $8,274 $1,008 Implemented
KU0266 # 04 Y:1988 04 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,624 $100 Implemented
KU0266 # 05 Y:1988 05 1988 RECOVER AND REUSE COOLING WATER $791 $860 Implemented
KU0266 # 07 Y:1988 07 1988 RECOVER WASTE HEAT FROM EQUIPMENT $898 $1,500 Implemented
KU0266 # 09 Y:1988 09 1988 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $396 $580 Implemented
KU0256 # 02 Y:1988 02 1988 INSTALL TIMERS AND/OR THERMOSTATS $7,001 $0 Implemented
KU0256 # 03 Y:1988 03 1988 IMPROVE LUBRICATION PRACTICES $452 $0 Implemented
KU0256 # 04 Y:1988 04 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $301 $0 Implemented
KU0256 # 05 Y:1988 05 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $309 $600 Implemented
KU0257 # 02 Y:1988 02 1988 INSTALL AUTOMATIC STACK DAMPER $2,887 $4,800 Implemented
KU0257 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,063 $750 Implemented
KU0257 # 04 Y:1988 04 1988 IMPROVE LUBRICATION PRACTICES $2,456 $0 Implemented
KU0257 # 05 Y:1988 05 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,026 $0 Implemented
KU0257 # 06 Y:1988 06 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,636 $1,700 Implemented
KU0257 # 07 Y:1988 07 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $146 $0 Implemented
KU0258 # 03 Y:1988 03 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $604 $950 Implemented
KU0258 # 04 Y:1988 04 1988 INSULATE BARE EQUIPMENT $599 $600 Implemented
KU0258 # 05 Y:1988 05 1988 SHUT OFF PILOTS IN STANDBY EQUIPMENT $198 $0 Implemented
KU0258 # 06 Y:1988 06 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $235 $0 Implemented