Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,344
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0195 # 07 Y:1986 | 07 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $964 | $600 | Implemented |
KU0195 # 08 Y:1986 | 08 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $148 | $200 | Implemented |
KU0195 # 09 Y:1986 | 09 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $124 | $200 | Implemented |
KU0195 # 10 Y:1986 | 10 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $229 | $0 | Implemented |
KU0195 # 11 Y:1986 | 11 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $456 | $700 | Implemented |
KU0195 # 12 Y:1986 | 12 | 1986 | IMPROVE LUBRICATION PRACTICES | $495 | $200 | Implemented |
KU0195 # 13 Y:1986 | 13 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $272 | $0 | Implemented |
KU0190 # 01 Y:1986 | 01 | 1986 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $3,383 | $50 | Implemented |
KU0190 # 02 Y:1986 | 02 | 1986 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $215 | $0 | Implemented |
KU0190 # 03 Y:1986 | 03 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,038 | $1,510 | Implemented |
KU0190 # 05 Y:1986 | 05 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $658 | $120 | Implemented |
KU0190 # 06 Y:1986 | 06 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $673 | $10 | Implemented |
KU0190 # 07 Y:1986 | 07 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $249 | $50 | Implemented |
KU0190 # 08 Y:1986 | 08 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $207 | $0 | Implemented |
KU0191 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,594 | $2,592 | Implemented |
KU0191 # 03 Y:1986 | 03 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $423 | $100 | Implemented |
KU0191 # 04 Y:1986 | 04 | 1986 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $221 | $0 | Implemented |
KU0191 # 05 Y:1986 | 05 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $525 | $0 | Implemented |
KU0187 # 01 Y:1986 | 01 | 1986 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,097 | $193 | Implemented |
KU0187 # 02 Y:1986 | 02 | 1986 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $1,550 | $2,000 | Implemented |
KU0187 # 03 Y:1986 | 03 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $218 | $0 | Implemented |
KU0187 # 05 Y:1986 | 05 | 1986 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $231 | $0 | Implemented |
KU0187 # 06 Y:1986 | 06 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $136 | $0 | Implemented |
KU0188 # 03 Y:1986 | 03 | 1986 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $2,183 | $900 | Implemented |
KU0188 # 04 Y:1986 | 04 | 1986 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $3,400 | $4,600 | Implemented |