Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,813
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0133 # 05 Y:1984 | 05 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $5,567 | $1,589 | Implemented |
KU0133 # 06 Y:1984 | 06 | 1984 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $4,813 | $2,800 | Implemented |
KU0133 # 07 Y:1984 | 07 | 1984 | IMPROVE LUBRICATION PRACTICES | $3,302 | $1,950 | Not Implemented |
KU0133 # 08 Y:1984 | 08 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,626 | $0 | Implemented |
KU0133 # 09 Y:1984 | 09 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $1,231 | $3,300 | Implemented |
KU0133 # 10 Y:1984 | 10 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,584 | $2,900 | Implemented |
KU0133 # 11 Y:1984 | 11 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,316 | $450 | Implemented |
KU0133 # 12 Y:1984 | 12 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,130 | $113 | Implemented |
KU0133 # 13 Y:1984 | 13 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,562 | $0 | Implemented |
KU0133 # 14 Y:1984 | 14 | 1984 | INSULATE BARE EQUIPMENT | $669 | $400 | Implemented |
KU0133 # 15 Y:1984 | 15 | 1984 | INSULATE BARE EQUIPMENT | $626 | $450 | Implemented |
KU0133 # 16 Y:1984 | 16 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $378 | $0 | Implemented |
KU0133 # 17 Y:1984 | 17 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $365 | $144 | Implemented |
KU0133 # 18 Y:1984 | 18 | 1984 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $245 | $250 | Implemented |
KU0134 # 01 Y:1984 | 01 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $22,362 | $30,000 | Not Implemented |
KU0134 # 02 Y:1984 | 02 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,178 | $22,400 | Not Implemented |
KU0134 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,241 | $3,991 | Implemented |
KU0134 # 04 Y:1984 | 04 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,694 | $3,800 | Implemented |
KU0134 # 05 Y:1984 | 05 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,505 | $986 | Implemented |
KU0134 # 06 Y:1984 | 06 | 1984 | INSTALL TURBULATORS | $3,913 | $700 | Not Implemented |
KU0134 # 07 Y:1984 | 07 | 1984 | REPAIR AND ELIMINATE STEAM LEAKS | $2,701 | $0 | Implemented |
KU0134 # 08 Y:1984 | 08 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $1,739 | $3,900 | Not Implemented |
KU0134 # 09 Y:1984 | 09 | 1984 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,941 | $5,000 | Not Implemented |
KU0134 # 10 Y:1984 | 10 | 1984 | USE MINIMUM STEAM OPERATING PRESSURE | $1,264 | $0 | Not Implemented |
KU0134 # 11 Y:1984 | 11 | 1984 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,273 | $1,069 | Not Implemented |