Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,813
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0134 # 12 Y:1984 | 12 | 1984 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $457 | $0 | Not Implemented |
KU0134 # 13 Y:1984 | 13 | 1984 | INSULATE BARE EQUIPMENT | $328 | $217 | Not Implemented |
KU0134 # 14 Y:1984 | 14 | 1984 | IMPROVE LUBRICATION PRACTICES | $7,532 | $3,000 | Not Implemented |
KU0134 # 15 Y:1984 | 15 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,352 | $0 | Implemented |
KU0134 # 16 Y:1984 | 16 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,474 | $350 | Not Implemented |
KU0134 # 17 Y:1984 | 17 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $885 | $680 | Not Implemented |
KU0134 # 18 Y:1984 | 18 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,284 | $6,000 | Not Implemented |
KU0134 # 19 Y:1984 | 19 | 1984 | INSULATE BARE EQUIPMENT | $2,213 | $550 | Not Implemented |
KU0134 # 20 Y:1984 | 20 | 1984 | INSULATE BARE EQUIPMENT | $1,264 | $241 | Not Implemented |
KU0134 # 21 Y:1984 | 21 | 1984 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $569 | $0 | Not Implemented |
KU0134 # 22 Y:1984 | 22 | 1984 | INSULATE BARE EQUIPMENT | $508 | $60 | Not Implemented |
KU0134 # 23 Y:1984 | 23 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $395 | $250 | Implemented |
KU0134 # 24 Y:1984 | 24 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $340 | $41 | Not Implemented |
KU0135 # 01 Y:1984 | 01 | 1984 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,770 | $17,000 | Not Implemented |
KU0135 # 02 Y:1984 | 02 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $9,768 | $0 | Implemented |
KU0135 # 03 Y:1984 | 03 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $194 | $0 | Implemented |
KU0135 # 04 Y:1984 | 04 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,716 | $2,000 | Implemented |
KU0135 # 05 Y:1984 | 05 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,516 | $2,774 | Not Implemented |
KU0135 # 06 Y:1984 | 06 | 1984 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,809 | $3,750 | Not Implemented |
KU0135 # 07 Y:1984 | 07 | 1984 | IMPROVE LUBRICATION PRACTICES | $6,508 | $2,250 | Not Implemented |
KU0135 # 08 Y:1984 | 08 | 1984 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $4,591 | $7,800 | Not Implemented |
KU0135 # 09 Y:1984 | 09 | 1984 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $4,203 | $100 | Implemented |
KU0135 # 10 Y:1984 | 10 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,389 | $5,000 | Implemented |
KU0135 # 11 Y:1984 | 11 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $1,487 | $1,300 | Not Implemented |
KU0135 # 13 Y:1984 | 13 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,886 | $78 | Implemented |