IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,813

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0118 # 05 Y:1984 05 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $883 $0 Implemented
KU0118 # 06 Y:1984 06 1984 SHUT OFF PILOTS IN STANDBY EQUIPMENT $866 $0 Implemented
KU0118 # 07 Y:1984 07 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $463 $0 Implemented
KU0118 # 08 Y:1984 08 1984 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $386 $400 Not Implemented
KU0118 # 09 Y:1984 09 1984 IMPROVE LUBRICATION PRACTICES $386 $500 Not Implemented
KU0118 # 10 Y:1984 10 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $630 $55 Not Implemented
KU0118 # 11 Y:1984 11 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $519 $200 Implemented
KU0118 # 12 Y:1984 12 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $325 $0 Implemented
KU0119 # 01 Y:1984 01 1984 RECOVER WASTE HEAT FROM EQUIPMENT $21,545 $16,000 Implemented
KU0119 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,576 $5,000 Not Implemented
KU0119 # 03 Y:1984 03 1984 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,583 $7,400 Not Implemented
KU0119 # 04 Y:1984 04 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $4,150 $3,590 Implemented
KU0119 # 05 Y:1984 05 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,365 $3,208 Not Implemented
KU0119 # 06 Y:1984 06 1984 INSTALL TURBULATORS $2,558 $1,261 Not Implemented
KU0119 # 07 Y:1984 07 1984 OPERATE BOILERS ON HIGH FIRE SETTING $2,034 $50 Implemented
KU0119 # 08 Y:1984 08 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,240 $0 Implemented
KU0119 # 09 Y:1984 09 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $982 $200 Implemented
KU0119 # 10 Y:1984 10 1984 USE MINIMUM STEAM OPERATING PRESSURE $939 $0 Not Implemented
KU0119 # 11 Y:1984 11 1984 INSTALL TIMERS AND/OR THERMOSTATS $486 $465 Not Implemented
KU0119 # 12 Y:1984 12 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $393 $50 Implemented
KU0119 # 13 Y:1984 13 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $288 $120 Not Implemented
KU0119 # 14 Y:1984 14 1984 INSULATE BARE EQUIPMENT $264 $150 Implemented
KU0119 # 15 Y:1984 15 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $262 $30 Not Implemented
KU0119 # 16 Y:1984 16 1984 INSULATE BARE EQUIPMENT $139 $135 Not Implemented
KU0120 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,272 $2,159 Implemented