Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
200
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0209 # 18 Y:1986 | 18 | 1986 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $135 | $0 | Implemented |
KU0206 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,289 | $5,696 | Implemented |
KU0206 # 02 Y:1986 | 02 | 1986 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,313 | $107 | Implemented |
KU0206 # 03 Y:1986 | 03 | 1986 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,935 | $1,500 | Implemented |
KU0206 # 04 Y:1986 | 04 | 1986 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,243 | $0 | Not Implemented |
KU0206 # 05 Y:1986 | 05 | 1986 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,155 | $4,000 | Not Implemented |
KU0206 # 06 Y:1986 | 06 | 1986 | IMPROVE LUBRICATION PRACTICES | $1,718 | $1,515 | Not Implemented |
KU0206 # 07 Y:1986 | 07 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $641 | $0 | Not Implemented |
KU0206 # 08 Y:1986 | 08 | 1986 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $474 | $0 | Implemented |
KU0206 # 09 Y:1986 | 09 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $979 | $0 | Not Implemented |
KU0206 # 10 Y:1986 | 10 | 1986 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $239 | $0 | Implemented |
KU0206 # 11 Y:1986 | 11 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $183 | $100 | Implemented |
KU0206 # 12 Y:1986 | 12 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $115 | $0 | Implemented |
KU0209 # 01 Y:1986 | 01 | 1986 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $37,717 | $30,000 | Not Implemented |
KU0209 # 02 Y:1986 | 02 | 1986 | IMPROVE LUBRICATION PRACTICES | $23,084 | $20,000 | Not Implemented |
KU0209 # 03 Y:1986 | 03 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $19,573 | $13,500 | Not Implemented |
KU0209 # 05 Y:1986 | 05 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,981 | $20,000 | Implemented |
KU0209 # 04 Y:1986 | 04 | 1986 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $25,756 | $5,000 | Not Implemented |
KU0209 # 17 Y:1986 | 17 | 1986 | USE COMPRESSOR AIR FILTERS | $161 | $50 | Implemented |
KU0209 # 16 Y:1986 | 16 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $353 | $50 | Implemented |
KU0209 # 15 Y:1986 | 15 | 1986 | INSTALL TURBULATORS | $392 | $2,500 | Implemented |
KU0209 # 14 Y:1986 | 14 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $736 | $50 | Implemented |
KU0209 # 13 Y:1986 | 13 | 1986 | KEEP BOILER TUBES CLEAN | $796 | $1,600 | Implemented |
KU0209 # 12 Y:1986 | 12 | 1986 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $809 | $0 | Implemented |
KU0209 # 06 Y:1986 | 06 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,092 | $0 | Not Implemented |