IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

330

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0181 # 03 Y:1985 03 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,466 $3,000 Not Implemented
KU0181 # 05 Y:1985 05 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $891 $150 Implemented
KU0181 # 08 Y:1985 08 1985 ELIMINATE LEAKS IN WATER LINES AND VALVES $178 $100 Implemented
KU0181 # 06 Y:1985 06 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $260 $0 Not Implemented
KU0181 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,446 $600 Implemented
KU0181 # 01 Y:1985 01 1985 INSULATE BARE EQUIPMENT $10,210 $1,200 Implemented
KU0181 # 07 Y:1985 07 1985 INSTALL AUTOMATIC STACK DAMPER $688 $700 Not Implemented
KU0181 # 02 Y:1985 02 1985 IMPROVE LUBRICATION PRACTICES $2,813 $750 Implemented
KU0177 # 06 Y:1985 06 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,218 $700 Implemented
KU0177 # 08 Y:1985 08 1985 OPTIMIZE PLANT POWER FACTOR $1,714 $4,000 Implemented
KU0176 # 01 Y:1985 01 1985 INSTALL AUTOMATIC STACK DAMPER $1,232 $1,875 Not Implemented
KU0176 # 03 Y:1985 03 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $618 $1,200 Not Implemented
KU0175 # 09 Y:1985 09 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $175 $0 Implemented
KU0177 # 05 Y:1985 05 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $754 $200 Implemented
KU0177 # 02 Y:1985 02 1985 INSTALL TIMERS AND/OR THERMOSTATS $4,851 $2,700 Implemented
KU0175 # 05 Y:1985 05 1985 INSTALL AUTOMATIC STACK DAMPER $414 $1,300 Not Implemented
KU0176 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,562 $1,540 Implemented
KU0177 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $972 $0 Implemented
KU0176 # 04 Y:1985 04 1985 REDUCE VENTILATION AIR $227 $200 Not Implemented
KU0177 # 09 Y:1985 09 1985 IMPROVE LUBRICATION PRACTICES $232 $200 Not Implemented
KU0175 # 08 Y:1985 08 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $191 $0 Implemented
KU0176 # 05 Y:1985 05 1985 SHUT OFF PILOTS IN STANDBY EQUIPMENT $203 $0 Implemented
KU0177 # 04 Y:1985 04 1985 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $110 $0 Implemented
KU0177 # 07 Y:1985 07 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $174 $10 Not Implemented
KU0177 # 10 Y:1985 10 1985 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $721 $0 Implemented