Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
130
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0486 # 09 Y:1997 | 09 | 1997 | COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES | $590 | $170 | Not Implemented |
KU0486 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,010 | $790 | Implemented |
KU0486 # 08 Y:1997 | 08 | 1997 | RECYCLE WASTE INK AND CLEANUP SOLVENT | $3,180 | $0 | Not Implemented |
KU0486 # 06 Y:1997 | 06 | 1997 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,020 | $2,980 | Implemented |
KU0486 # 04 Y:1997 | 04 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,080 | $9,220 | Not Implemented |
KU0486 # 07 Y:1997 | 07 | 1997 | INSTALL OCCUPANCY SENSORS | $1,560 | $1,150 | Implemented |
KU0486 # 05 Y:1997 | 05 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,990 | $10,200 | Implemented |
KU0486 # 01 Y:1997 | 01 | 1997 | INSULATE BARE EQUIPMENT | $12,940 | $11,560 | Implemented |
KU0486 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,710 | $13,580 | Implemented |
KU0485 # 08 Y:1997 | 08 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $128,310 | $186,000 | Not Implemented |
KU0485 # 03 Y:1997 | 03 | 1997 | INSULATE BARE EQUIPMENT | $470 | $300 | Implemented |
KU0485 # 05 Y:1997 | 05 | 1997 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $2,170 | $5,260 | Not Implemented |
KU0485 # 06 Y:1997 | 06 | 1997 | RECOVER AND REUSE COOLING WATER | $1,080 | $1,180 | Implemented |
KU0485 # 04 Y:1997 | 04 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $230 | $40 | Not Implemented |
KU0485 # 07 Y:1997 | 07 | 1997 | METER WASTE WATER | $230 | $100 | Implemented |
KU0485 # 01 Y:1997 | 01 | 1997 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,310 | $190 | Implemented |
KU0485 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $560 | $660 | Implemented |
KU0484 # 02 Y:1997 | 02 | 1997 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,770 | $14,200 | Implemented |
KU0484 # 08 Y:1997 | 08 | 1997 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $310 | $1,050 | Not Implemented |
KU0484 # 01 Y:1997 | 01 | 1997 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $9,050 | $26,400 | Not Implemented |
KU0484 # 09 Y:1997 | 09 | 1997 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $18,220 | $4,200 | Implemented |
KU0484 # 03 Y:1997 | 03 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,370 | $24,290 | Implemented |
KU0484 # 05 Y:1997 | 05 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,270 | $1,350 | Not Implemented |
KU0484 # 04 Y:1997 | 04 | 1997 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,410 | $640 | Not Implemented |
KU0484 # 07 Y:1997 | 07 | 1997 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,660 | $0 | Implemented |