IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

958

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0326 # 07 Y:2011 07 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,949 $500 Not Implemented
LE0326 # 08 Y:2011 08 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,956 $25 Implemented
LE0326 # 09 Y:2011 09 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,818 $1,000 Implemented
LE0326 # 10 Y:2011 10 2011 RECOVER WASTE HEAT FROM EQUIPMENT $1,381 $2,000 Not Implemented
LE0326 # 11 Y:2011 11 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,230 $35,000 Implemented
LE0319 # 01 Y:2011 01 2011 MINIMIZE WATER USAGE $66,284 $168,000 Not Implemented
LE0319 # 02 Y:2011 02 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $30,212 $5,424 Implemented
LE0319 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,751 $160 Not Implemented
LE0319 # 04 Y:2011 04 2011 OPERATE BOILERS ON HIGH FIRE SETTING $16,771 $0 Implemented
LE0319 # 05 Y:2011 05 2011 METER WASTE WATER $10,797 $3,240 Not Implemented
LE0300 # 01 Y:2010 01 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $161,306 $1,080,000 Not Implemented
LE0300 # 02 Y:2010 02 2010 UPGRADE OBSOLETE EQUIPMENT $30,883 $29,000 Not Implemented
LE0300 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,838 $19,900 Implemented
LE0300 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,921 $2,440 Implemented
LE0300 # 05 Y:2010 05 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,417 $30,000 Implemented
LE0300 # 06 Y:2010 06 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,315 $3,000 Implemented
LE0300 # 07 Y:2010 07 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,827 $1,000 Implemented
LE0300 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $8,078 $900 Implemented
LE0300 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,263 $42,718 Implemented
LE0289 # 01 Y:2009 01 2009 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $19,778 $20,000 Implemented
LE0289 # 02 Y:2009 02 2009 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $12,698 $2,600 Not Implemented
LE0289 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,495 $11,500 Not Implemented
LE0289 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,121 $304 Implemented
LE0289 # 05 Y:2009 05 2009 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,908 $12,000 Not Implemented
LE0289 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,888 $2,824 Implemented