IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

936

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0038 # 03 Y:2002 03 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,662 $1,100 Implemented
LM0038 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,190 $90 Implemented
LM0038 # 05 Y:2002 05 2002 ADD AREA LIGHTING SWITCHES $898 $800 Implemented
LM0038 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,602 $60 Implemented
LM0038 # 07 Y:2002 07 2002 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $39,000 $20,250 Not Implemented
LM0038 # 08 Y:2002 08 2002 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $22,500 $1,000 Not Implemented
LM0037 # 01 Y:2002 01 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,266 $1,050 Not Implemented
LM0037 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,665 $2,150 Not Implemented
LM0037 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,259 $1,700 Implemented
LM0037 # 04 Y:2002 04 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,595 $27,000 Not Implemented
LM0037 # 05 Y:2002 05 2002 USE OPTIMUM THICKNESS INSULATION $1,908 $306 Not Implemented
LM0037 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $755 $224 Not Implemented
LM0037 # 07 Y:2002 07 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $45,000 $40,000 Not Implemented
LM0037 # 08 Y:2002 08 2002 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $17,066 $14,227 Not Implemented
LM0036 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $203,445 $95,480 Implemented
LM0036 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,227 $1,335 Implemented
LM0036 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,015 $550 Implemented
LM0036 # 04 Y:2002 04 2002 UPGRADE CONTROLS ON COMPRESSORS $19,570 $300 Not Implemented
LM0036 # 05 Y:2002 05 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,342 $4,800 Implemented
LM0036 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,928 $23,600 Not Implemented
LM0036 # 07 Y:2002 07 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,505 $21,928 Not Implemented
LM0036 # 08 Y:2002 08 2002 INSTALL SENSORS TO DETECT AND AVOID JAMS $101,250 $15,800 Implemented
LM0036 # 09 Y:2002 09 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $145,152 $2,000 Not Implemented
LM0036 # 10 Y:2002 10 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $202,078 $453,275 Not Implemented
LM0036 # 11 Y:2002 11 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $199,710 $14,000 Implemented